Show on map
Bartow Davidson — Power plant · Solar · Madison Energy Holdings LLCTHE KEEP 2 CAMPUS — Filed · Large load · GA · 10.3 mi away
  • Wind & solar
  • Loads
  • In development
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Bartow Davidson

Power plant · Solar

Key facts

Power plant · Solarran 25% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2023
Net generation, 2025
5,697 MWh
Grid
25 kV to Georgia Power Co (SOCO)
Location
Bartow County, Georgia
Operated by
Madison Energy Holdings LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2023 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
3 years since 2023
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100001048543
Location id
L100001043042
Eia plant ids
66980
Grid
Nerc region
SERC
Report year
2025
Grid voltage kv
24.90
Transmission owner
Georgia Power Co
Balancing authority code
SOCO
Balancing authority name
Southern Company Services, Inc. - Trans
Fuel burned (MMBtu), 202519,438
Capacity factor, 20250.250
Net generation (MWh), 20255,697
Balancing authority codeSOCO

Solar arrays

Array area (acres)
13.2
AC capacity (MW)
2.6
DC capacity (MW)
3.5
Mounting
Single-axis tracking
Site type
Greenfield
Began operating
2023

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
THE KEEP 2 CAMPUS Filed Large load 10.3 mi

Sources EPA ICIS-Air

Sources

Attribution