Show on map
Battleground — Power plant · Solar · AES Distributed EnergyBELLSOUTH TELECOMMUNICATIONS, LLC DBA AT&T NORTH CAROLINA — Large load · NC · 6.3 km awayCleveland Cnty Generating Facility — Gas, combustion turbine · NC · 736 MW · 9.6 km awayHigh Pockets Solar — Solar · NC · 1.9 MW · 22.1 km awayPeanut Solar — Solar · NC · 5 MW · 24.4 km away
  • Wind & solar
  • Loads
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Battleground

Power plant · Solar

Key facts

Power plant · Solarran 16% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2013
Net generation, 2025
4,924 MWh
Grid
12 kV to Duke Energy Carolinas, LLC (DUK)
Location
Cleveland County, North Carolina
Operated by
AES Distributed EnergySourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2013 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
13 years since 2013
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000814633
Location id
L100000812032
Eia plant ids
59038
Grid
Nerc region
SERC
Report year
2025
Grid voltage kv
12.50
Transmission owner
Duke Energy Carolinas, LLC
Balancing authority code
DUK
Balancing authority name
Duke Energy Carolinas
Fuel burned (MMBtu), 202516,801
Capacity factor, 20250.161
Net generation (MWh), 20254,924
Balancing authority codeDUK

Solar arrays

Array area (acres)
16.1
AC capacity (MW)
3
DC capacity (MW)
4.3
Mounting
Fixed tilt
Site type
Greenfield
Began operating
2013

Source USPVDB

Source

  • U.S. Large-Scale Solar Photovoltaic DatabaseOpen license · retrieved 25 Oct 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
BELLSOUTH TELECOMMUNICATIONS, LLC DBA AT&T NORTH CAROLINA Built Large load 6.3 km
Cleveland Cnty Generating Facility Postponed Gas, combustion turbine 9.6 km 736
High Pockets Solar Postponed Solar 22.1 km 1.9
Peanut Solar Postponed Solar 24.4 km 5