Show on map
Baxter Wilson - Sterlington 500 kV — Transmission lineVicksburg Advanced Power Station — Under construction · Gas, other · MS · 820 MW · 0.1 mi awayFranklin Farms 1&2 — Studied · Gas, other · LA · 1,640 MW · 0.2 mi awaySR Delhi — Postponed · Solar · LA · 4.8 MW · 1.8 mi awaySR Dunn — Postponed · Solar · LA · 3 MW · 3.1 mi awayRPL 6 Data Hall (Rayville data centre) — Filed · Large load · LA · 3.6 mi awayRichland Parish Power Station 4 — Announced · Gas, combined cycle · LA · 780.3 MW · 4.2 mi awayRichland Parish Power Station 3 — Announced · Gas, combined cycle · LA · 780.3 MW · 4.3 mi awayRichland Parish Power Station 1&2 — Studied · Gas, other · LA · 1,640 MW · 5.5 mi awayErgon Refining Vicksburg — Under construction · Gas, combustion turbine · MS · 15.8 MW · 5.6 mi awaySR South Bastrop — Under construction · Solar · LA · 4.8 MW · 5.7 mi awaySR North Bastrop — Postponed · Solar · LA · 4.8 MW · 9.5 mi away
  • Combustion
  • Wind & solar
  • Loads
  • In development
  • Under construction
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Baxter Wilson - Sterlington 500 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
500 kV
States crossed
US-LA, US-MS

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
71
Substations at the ends (as the source names them)
Baxter Wilson to Sterlington
All 2 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
HIFLD line ID142193
Voltage class500 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Vicksburg Advanced Power Station Under construction Gas, other 0.1 mi 820
Franklin Farms 1&2 Studied Gas, other 0.2 mi 1,640
SR Delhi Postponed Solar 1.8 mi 4.8
SR Dunn Postponed Solar 3.1 mi 3
RPL 6 Data Hall (Rayville data centre) Filed Large load 3.6 mi
Richland Parish Power Station 4 Announced Gas, combined cycle 4.2 mi 780.3
Richland Parish Power Station 3 Announced Gas, combined cycle 4.3 mi 780.3
Richland Parish Power Station 1&2 Studied Gas, other 5.5 mi 1,640
Ergon Refining Vicksburg Under construction Gas, combustion turbine 5.6 mi 15.8
SR South Bastrop Under construction Solar 5.7 mi 4.8
SR North Bastrop Postponed Solar 9.5 mi 4.8

Sources Berkeley Lab · EIA-860M · FAA OE/AAA

Sources

  • Berkeley LabOpen license, with credit · retrieved Nov 4, 2026Lawrence Berkeley National Laboratory and GridTracker, Queued Up data file (2026 edition), CC BY 4.0. Modified by Inframation: non-ISO and MISO regions only; MISO rows labelled with the date the file's queue data runs to; statuses and technologies mapped to Inframation's vocabulary. Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker.
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • FAA OE/AAAOpen license · retrieved Nov 16, 2026

Attribution