Show on map
- Combustion
- Wind & solar
- Loads
- In development
- Under construction
- Size not stated
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Combustion
- Wind & solar
- Loads
- In development
- Under construction
- Size not stated
- Other infrastructure
Baxter Wilson - Sterlington 500 kV: route and 11 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Baxter Wilson - Sterlington 500 kV
Transmission line
- Mapped route length
- Mapped route length: sourceLBNL · Open license, with creditmiles
- Voltage
- 500 kV
- States crossed
- US-LA, US-MS
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Mapped route length (miles)
- 71
- Substations at the ends (as the source names them)
- Baxter Wilson to Sterlington
All 2 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
| Attribute | Value |
|---|---|
| HIFLD line ID | 142193 |
| Voltage class | 500 kV |
Sources
1 sourceSources LBNL
Sources
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
Around this line
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Vicksburg Advanced Power Station Under construction | Gas, other | 0.1 mi | 820 |
| Franklin Farms 1&2 Studied | Gas, other | 0.2 mi | 1,640 |
| SR Delhi Postponed | Solar | 1.8 mi | 4.8 |
| SR Dunn Postponed | Solar | 3.1 mi | 3 |
| RPL 6 Data Hall (Rayville data centre) Filed | Large load | 3.6 mi | |
| Richland Parish Power Station 4 Announced | Gas, combined cycle | 4.2 mi | 780.3 |
| Richland Parish Power Station 3 Announced | Gas, combined cycle | 4.3 mi | 780.3 |
| Richland Parish Power Station 1&2 Studied | Gas, other | 5.5 mi | 1,640 |
| Ergon Refining Vicksburg Under construction | Gas, combustion turbine | 5.6 mi | 15.8 |
| SR South Bastrop Under construction | Solar | 5.7 mi | 4.8 |
| SR North Bastrop Postponed | Solar | 9.5 mi | 4.8 |
Sources Berkeley Lab · EIA-860M · FAA OE/AAA
Sources
- Berkeley LabLawrence Berkeley National Laboratory and GridTracker, Queued Up data file (2026 edition), CC BY 4.0. Modified by Inframation: non-ISO and MISO regions only; MISO rows labelled with the date the file's queue data runs to; statuses and technologies mapped to Inframation's vocabulary. Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker.
- EIA-860M
- FAA OE/AAA