Show on map
Bay Trail Solar Power Plant — Power plant · Solar · Duke Energy Florida, LLCPowerline Energy Storage — Under construction · Storage · FL · 100 MW · 4.0 mi awayLevy Nuclear Plant — Withdrawn · Nuclear · FL · 2,500 MW · 5.9 mi away
  • Wind & solar
  • Storage
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Bay Trail Solar Power Plant

Power plant · Solar

Key facts

Power plant · Solarran 25% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2022
Net generation, 2025
163,460 MWh
Grid
230 kV to Duke Energy Florida, LLC (FPC)
Location
Citrus County, Florida
Operated by
Duke Energy Florida, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2022 to 2026

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
4 years since 2022
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000805035
Location id
L100000804382
Eia plant ids
64145
Grid
Nerc region
SERC
Report year
2025
Grid voltage kv
230
Transmission owner
Duke Energy Florida, LLC
Balancing authority code
FPC
Balancing authority name
Duke Energy Florida Inc
Fuel burned (MMBtu), 2025557,725
Capacity factor, 20250.249
Net generation (MWh), 2025163,460
Balancing authority codeFPC

Solar arrays

Array area (acres)
270.4
AC capacity (MW)
74.9
DC capacity (MW)
94.9
Mounting
Single-axis tracking
Site type
Greenfield
Began operating
2022

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Powerline Energy Storage Under construction Storage 4.0 mi 100
Levy Nuclear Plant Withdrawn Nuclear 5.9 mi 2,500

Sources EIA-860M · Berkeley Lab · Permitting Dashboard

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • Berkeley LabOpen license, with credit · retrieved Nov 4, 2026Lawrence Berkeley National Laboratory and GridTracker, Queued Up data file (2026 edition), CC BY 4.0. Modified by Inframation: non-ISO and MISO regions only; MISO rows labelled with the date the file's queue data runs to; statuses and technologies mapped to Inframation's vocabulary. Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker.
  • Permitting DashboardOpen license · retrieved Nov 16, 2026

Attribution