Bayonne Energy Center
- Combustion
- Wind & solar
- Storage
- Loads
- In development
- Under construction
- Operating
- Size not stated
- 10 · 100 · 1,000 MW
Map
- Combustion
- Wind & solar
- Storage
- Loads
- In development
- Under construction
- Operating
- Size not stated
Bayonne Energy Center: location and 35 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Bayonne Energy Center
Power plant · Gas, combustion turbine
Key facts
Power plant · Gas, combustion turbineran 17% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2012
- Net generation, 2025
- 931,725 MWh
- Grid
- 345 kV to Consolidated Edison Co-NY Inc (NYIS)
- Location
- Hudson County, New Jersey
- Operated by
- Bayonne Energy Center LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Gas
- Oil
Details
Who’s behind it
- Owner
- Bayonne Energy Center LLCSource100.0%, EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT), as of Dec 31, 2023
Interested in this project?
Set an alert
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
- Technology
- Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
- Age
- 14 years since 2012
- Unused energy
- 4,709 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
- Heat rate
- 9,833 Btu/kWh 2025
All 8 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Gem |
|
| Grid |
|
| EPA greenhouse gas reporting (GHGRP) |
|
| Fuel burned (MMBtu), 2025 | 9,161,593 |
| Capacity factor, 2025 | 0.165 |
| Heat rate (Btu/kWh), 2025 | 9,832.9 |
| Net generation (MWh), 2025 | 931,725.0 |
| Balancing authority code | NYIS |
Wind turbines
Wind turbines
USGS maps these turbines around a center 1.4 mi from the point this page maps the plant at; the nearest turbine is 1.4 mi from that point.
- Turbines
- 1
- Turbine capacity (MW)
- 1.5
- Turbine models
- 1 Leitner Poma LTW-77
- Hub height (m)
- 65
- Rotor diameter (m)
- 77
- Year online
- 2012
Source U.S. Wind Turbine Database
Source
- U.S. Wind Turbine DatabaseMap services and data are available from U.S. Wind Turbine Database, provided by the U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uswtdb
Timeline
- In service · EIA-860M
Sources
6 sourcesSources EIA-860M · GEM · U.S. Wind Turbine Database · EIA · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT) · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- U.S. Wind Turbine DatabaseMap services and data are available from U.S. Wind Turbine Database, provided by the U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uswtdb
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Bayonne Energy Center unit BESS1 Under construction | Battery storage | 0.0 mi | 49.8 |
| Staten Island Energy Storage 1 LLC Postponed | Battery storage | 3.0 mi | 5 |
| Prologis - SLNNJ036 - Community Solar Under construction | Solar | 3.9 mi | 1.6 |
| Gowanus Gas Turbines Generating Postponed | Gas, combustion turbine | 4.6 mi | 93 |
| RAR DEVELOPMENT ASSOCIATES × 2 units Built | Large load | 5.9 mi | |
| AB Newark Solar Postponed | Solar | 6.1 mi | 5.6 |
| Swiftsure Postponed | Battery storage | 6.2 mi | 121 |
| CDIL DATA CENTRE USA LLC Built | Large load | 6.2 mi | |
| Elizabeth Metropolitan Logistics Center Under construction | Solar | 6.4 mi | 1.2 |
| NJ TRANSITGRID Postponed | Gas, combustion turbine | 6.5 mi | 136.1 |
| Elevate Arthur Kill Under construction | Battery storage | 7.1 mi | 15.1 |
| NISA Electric Generation Project × 2 units Permitted | Battery storage | 7.4 mi | 392.5 |
| BPL NJ - Union Distribution Center Under construction | Solar | 8.2 mi | 1.5 |
| CYXTERA - NJ2X Built | Large load | 8.2 mi | |
| Bensonhurst Energy Storage 1 LLC Under construction | Battery storage | 8.3 mi | 5 |
| CORESITE NY4 DATA CENTER Under construction | Large load | 8.4 mi | |
| Jamaica Community Energy, LLC Under construction | Battery storage | 8.6 mi | 4.9 |
| Heron Clean Energy, LLC Under construction | Battery storage | 8.7 mi | 4.9 |
| EQUINIX Built | Large load | 8.7 mi | |
| EQUINIX LLC Built | Large load | 8.8 mi | |
| Coreweave Under construction | Large load | 9.7 mi | |
| Blue Aster B Clean Energy LLC Under construction | Battery storage | 10.1 mi | 4.9 |
| Blue Aster Clean Energy LLC Under construction | Battery storage | 10.1 mi | 4.9 |
| Blue Aster C Clean Energy LLC Under construction | Battery storage | 10.1 mi | 4.9 |
| BARCLAYS CAPITAL DATA CENTER Built | Large load | 10.2 mi | |
| Ravenswood Postponed | Battery storage | 10.6 mi | 316 |
| Roseate Tern Clean Energy LLC Under construction | Battery storage | 11.6 mi | 3.3 |
| CLIFTON DATA CENTER Built | Large load | 12.7 mi | |
| New York University Central Plant Under construction | Gas, combined cycle | 12.9 mi | 5.5 |
| Astoria Gas Turbines Postponed | Gas, combustion turbine | 13.5 mi | 431 |
| Linden Clean Energy, LLC Under construction | Battery storage | 14.3 mi | 3.7 |
| Coral Honeysuckle Clean Energy LLC Under construction | Battery storage | 14.3 mi | 3.7 |
| Lincoln Medical and Mental Health Center Under construction | Oil | 14.3 mi | 1 |
Sources EIA-860M · EPA ICIS-Air · EPA ICIS-NPDES · FAA OE/AAA