Show on map
BC Landfill Energy LLC — Power plant · Biomass · BC Landfill Energy LLCAMAZON DATA SVCS INC PNE100 — Built · Large load · PA · 7.7 mi awayVicinity Energy Trenton, L.P. — Postponed · Gas, combustion turbine · NJ · 9.2 MW · 11.2 mi away
  • Bioenergy
  • Loads
  • Operating
  • Retired
  • Size not stated
  • 10 · 100 · 1,000 MW

BC Landfill Energy LLC

Power plant · Biomass

Key facts

Power plant · Biomassran 62% of 2019 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2007
Net generation, 2019
40,455 MWh
Location
Burlington County, New Jersey
Operated by
BC Landfill Energy LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2011 to 2020
Fuel burned MMBtu by year, 2011 to 2020
  • Biomass and waste

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Technology
Biomass source: “Landfill Gas”
Age
19 years since 2007
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Balancing authority codePJM

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
June 2020
Capacity retired
7.5 MW
Generators retired
5
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
UNIT1Landfill Gas1.5 MWRetiredJune 2020
UNIT2Landfill Gas1.5 MWRetiredJune 2020
UNIT3Landfill Gas1.5 MWRetiredJune 2020
UNIT4Landfill Gas1.5 MWRetiredJune 2020
UNIT5Landfill Gas1.5 MWRetiredJune 2020

Grid

EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).
Balancing authority
PJM
Transmission lines within 15 mi (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units UNIT1, UNIT2, UNIT3, UNIT4, UNIT5 scheduled to retire, 7.5 MW · EIA-860M
  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
AMAZON DATA SVCS INC PNE100 Built Large load 7.7 mi
Vicinity Energy Trenton, L.P. Postponed Gas, combustion turbine 11.2 mi 9.2

Sources EPA ICIS-Air · EIA-860M

Sources

Attribution