BC Landfill Energy LLC
- Bioenergy
- Retired
- 10 · 100 · 1,000 MW
Map
- Bioenergy
- Retired
BC Landfill Energy LLC: location. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
BC Landfill Energy LLC
Power plant · Biomass
Key facts
Power plant · Biomassran 62% of 2019 Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2007
- Net generation, 2019
- 40,455 MWh
- Location
- Burlington County, New Jersey
- Operated by
- BC Landfill Energy LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Operations
- Net generation, 2019
- 40,455
MWh - Fuel burned, 2019
- 431,567
MMBtu - Capacity factor, 2019
- 61.6
% - Heat rate, 2019
- 10,668
Btu/kWh
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2020 (6 of 12 months) | 19,418 | 191,679 | — | 9,871 |
| 2019 | 40,455 | 431,567 | 61.6% | 10,668 |
| 2018 | 46,205 | 393,746 | 70.3% | 8,522 |
| 2017 | 44,515 | 422,775 | 67.8% | 9,497 |
| 2016 | 43,926 | 435,319 | 66.7% | 9,910 |
| 2015 | 44,305 | 443,746 | 67.4% | 10,016 |
| 2014 | 43,674 | 515,555 | 66.5% | 11,805 |
| 2013 | 35,852 | 458,046 | 54.6% | 12,776 |
| 2012 | 41,080 | 485,141 | 62.4% | 11,810 |
| 2011 | 42,585 | 505,809 | 64.8% | 11,878 |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.