Show on map
Beaver Valley - Clinton 345 kV — Transmission lineAligned Data Center Campus — Filed · Large load · PA · 1.6 mi awayMontgomery L&D Hydroelectric Project — Announced · Hydro · PA · 20.4 MW · 3.2 mi awayMontgomery L&D Hydroelectric Project — Postponed · Hydro · PA · 9.5 MW · 3.2 mi awayDashields Hydroelectric Project — Filed · Hydro · PA · 8.8 MW · 4.3 mi awayCOMCAST XSDC DATA CENTER — Built · Large load · PA · 6.5 mi awayRobinson Power Company LLC — Postponed · Gas, combined cycle · PA · 1,022.9 MW · 6.7 mi awayXEROX PITTSBURGH DATA CENTER — Built · Large load · PA · 9.2 mi awayEDMC DATA CENTER — Built · Large load · PA · 9.3 mi awayEmsworth BC Hydroelectric Project — Announced · Hydro · PA · 18.8 MW · 9.5 mi awayEmsworth L&D Hydroelectric Project — Announced · Hydro · PA · 20.4 MW · 10.1 mi awayNew Cumberland Hydroelectric Project — Filed · Hydro · WV · 20 MW · 11.7 mi awayWylie Ridge Solar — Filed · Solar · WV · 8.4 MW · 12.2 mi away
  • Clean firm
  • Wind & solar
  • Loads
  • In development
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Beaver Valley - Clinton 345 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
345 kV
States crossed
US-PA
Owner (as stated)
Duquesne Light

Details

Who’s behind it

Owner
Duquesne Light

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
15
Substations at the ends (as the source names them)
Beaver Valley to Clinton
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itduquesne light
HIFLD line ID129453
Voltage class345 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Aligned Data Center Campus Filed Large load 1.6 mi
Montgomery L&D Hydroelectric Project × 2 units Announced Hydro 3.2 mi 29.9
Dashields Hydroelectric Project Filed Hydro 4.3 mi 8.8
COMCAST XSDC DATA CENTER Built Large load 6.5 mi
Robinson Power Company LLC Postponed Gas, combined cycle 6.7 mi 1,022.9
XEROX PITTSBURGH DATA CENTER Built Large load 9.2 mi
EDMC DATA CENTER Built Large load 9.3 mi
Emsworth BC Hydroelectric Project Announced Hydro 9.5 mi 18.8
Emsworth L&D Hydroelectric Project Announced Hydro 10.1 mi 20.4
New Cumberland Hydroelectric Project Filed Hydro 11.7 mi 20
Wylie Ridge Solar Filed Solar 12.2 mi 8.4

Sources FAA OE/AAA · EIA-860M · EPA ICIS-NPDES · EPA ICIS-Air

Sources

Attribution