Show on map
Beaver Valley - Hanna 345 kV — Transmission lineAligned Data Center Campus — Filed · Large load · PA · 1.2 mi awayMontgomery L&D Hydroelectric Project — Announced · Hydro · PA · 20.4 MW · 2.7 mi awayMontgomery L&D Hydroelectric Project — Postponed · Hydro · PA · 9.5 MW · 2.7 mi awayStark Solar, LLC — Announced · Solar · OH · 150 MW · 9.5 mi awayMatador Solar — Postponed · Solar + storage · OH · 300 MW · 10.1 mi awayNew Cumberland Hydroelectric Project — Filed · Hydro · WV · 20 MW · 11.4 mi awayMahoning — Postponed · Biomass · OH · 0.8 MW · 11.8 mi awayDashields Hydroelectric Project — Filed · Hydro · PA · 8.8 MW · 12.6 mi awayWylie Ridge Solar — Filed · Solar · WV · 8.4 MW · 13.7 mi awayMCCo BESS Generating Facility — Under construction · Storage · OH · 15.6 MW · 14.4 mi away
  • Clean firm
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Beaver Valley - Hanna 345 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
345 kV
States crossed
US-OH, US-PA
Owner (as stated)
Duquesne Light

Details

Who’s behind it

Owner
Duquesne Light

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
60
Substations at the ends (as the source names them)
Beaver Valley to Hanna
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itduquesne light
HIFLD line ID100254
Voltage class345 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Aligned Data Center Campus Filed Large load 1.2 mi
Montgomery L&D Hydroelectric Project × 2 units Announced Hydro 2.7 mi 29.9
Stark Solar, LLC Announced Solar 9.5 mi 150
Matador Solar Postponed Solar + storage 10.1 mi 300
New Cumberland Hydroelectric Project Filed Hydro 11.4 mi 20
Mahoning Postponed Biomass 11.8 mi 0.8
Dashields Hydroelectric Project Filed Hydro 12.6 mi 8.8
Wylie Ridge Solar Filed Solar 13.7 mi 8.4
MCCo BESS Generating Facility Under construction Storage 14.4 mi 15.6

Sources FAA OE/AAA · EIA-860M

Sources

  • FAA OE/AAAOpen license · retrieved Nov 16, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution