- Combustion
- Under construction
- Operating
- 10 · 100 · 1,000 MW
Map
- Combustion
- Under construction
- Operating
Belleville: location and 1 exact-grade project within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Belleville
Power plant · Gas, reciprocating engine
Key facts
Power plant · Gas, reciprocating engineran 1% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1955
- Net generation, 2025
- 513 MWh
- Grid
- 69 kV to City of Belleville - (KS) (SWPP)
- Location
- Republic County, Kansas
- Operated by
- City of Belleville - (KS)SourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Gas
- Oil
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Gas, reciprocating engine source: “Natural Gas Internal Combustion Engine”
- Age
- 71 years since 1955
- Unused energy
- 82 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
- Heat rate
- 11,092 Btu/kWh 2025
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Fuel burned (MMBtu), 2025 | 5,690 |
| Capacity factor, 2025 | 0.006 |
| Heat rate (Btu/kWh), 2025 | 11,091.6 |
| Net generation (MWh), 2025 | 513 |
| Balancing authority code | SWPP |
Retirement
EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.- Capacity retired
- 5.1 MW
- Generators retired
- 1
- Capacity still in service
- 9.4 MW
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 7 | Natural Gas Internal Combustion Engine | 5.1 MW | Retired | January 2025 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 69 kV
- Transmission or distribution system owner
- City of Belleville - (KS)
- Balancing authority
- Southwest Power Pool
- NERC region
- MRO
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Unit 7 scheduled to retire, 5.1 MW · EIA-860M
- In service · EIA-860M
Sources
3 sourcesSources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Belleville Under construction | Oil | 0.0 mi | 6 |
Sources EIA-860M