Show on map
Beluga — Power plant · Gas, combustion turbine · Chugach Electric Assn Inc
  • Combustion
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Gas, combustion turbine

Key facts

Power plant · Gas, combustion turbine Standby
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1968
Net generation, 2025
-3,402 MWh
Grid
138 kV to Chugach Electric Assn Inc
Location
Kenai Peninsula County, Alaska

Output

Net generation MWh by year, 2001 to 2026
Fuel burned MMBtu by year, 2001 to 2026
  • Gas

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
Age
58 years since 1968
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110071162475
Subparts reported
C
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1005267
Eia status
By code
OS
Mw
92.50
Units
2
SB
Mw
219.9
Units
4
Standby mw
219.9
Status rule
majority_mw_standby
In service mw
312.4
Out of service mw
92.50
Fuel burned (MMBtu), 2025207,222
Net generation (MWh), 2025-3,402
Data notes (2)
  • Capacity factor, 2025 not shown: net generation -3402.0 MWh is not positive (the plant consumed at least as much as it produced over the year)
  • Heat rate (Btu/kWh), 2025 not shown: fuel burned but net generation is not positive

Retirement

Capacity retired
62 MW
Generators retired
1
Capacity still in service
312.4 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
8Natural Gas Fired Combined Cycle62 MWRetiredApril 2015

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
138 kV
Transmission or distribution system owner
Chugach Electric Assn Inc
Transmission lines within 25 km (3)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Chugach Electric Assn Inc Operator EIA-860M
CHUGACH ELECTRIC ASSOC INC Owner 100.0% 31 Dec 2023 EPA GHGRP

Timeline

  • Stated Unit 8 scheduled to retire, 62 MW · EIA-860M
  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

Every source and license · Attribution

View at source