Show on map
Bennington Wind — Power plant · Wind · Minonk Stewardship Wind LLCOld Town Wind — Wind · IL · 178 MW · 8.0 km awayOsagrove Flats Wind — Wind · IL · 150 MW · 9.8 km awayPrairie Violet Wind LLC — Wind · IL · 130 MW · 14.6 km awaySolitude — Solar · IL · 5 MW · 19.2 km awayPanther Grove 2 — Wind · IL · 472.5 MW · 24.8 km away
  • Wind & solar
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Bennington Wind

Power plant · Wind

Key facts

Power plant · Windran 37% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2021
Net generation, 2025
303,934 MWh
Grid
138 kV to Ameren Illinois Company (MISO)
Location
Marshall County, Illinois
Operated by
Minonk Stewardship Wind LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2021 to 2026

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Wind source: “Onshore Wind Turbine”
Age
5 years since 2021
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000909317
Location id
L100000906919
Eia plant ids
63384
Grid
Nerc region
SERC
Report year
2025
Grid voltage kv
138
Transmission owner
Ameren Illinois Company
Balancing authority code
MISO
Balancing authority name
Midcontinent Independent Transmission System Operator, Inc..
Fuel burned (MMBtu), 20251,037,022
Capacity factor, 20250.373
Net generation (MWh), 2025303,934
Balancing authority codeMISO

Wind turbines

Turbines
33
Turbine capacity (MW)
93.1
Turbine models
33 GE Wind GE2.82-127
Hub height (m)
89
Rotor diameter (m)
127
Year online
2021

Source U.S. Wind Turbine Database

Source

  • U.S. Wind Turbine DatabaseOpen license · retrieved 25 Oct 2026Map services and data are available from U.S. Wind Turbine Database, provided by the U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uswtdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · U.S. Wind Turbine Database · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Old Town Wind Announced Wind 8.0 km 178
Osagrove Flats Wind Under construction Wind 9.8 km 150
Prairie Violet Wind LLC Postponed Wind 14.6 km 130
Solitude Under construction Solar 19.2 km 5
Panther Grove 2 Under construction Wind 24.8 km 472.5

Sources EIA-860M

Sources

Attribution