Beowawe
Power plant · Geothermal
Key facts
Power plant · Geothermalran 35% of 2024 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2024
- Net generation, 2024
- 107,208 MWh
- Grid
- 66 kV to Sierra Pacific Power Co (NEVP)
- Location
- Lander County, Nevada
- Operated by
- Ormat Nevada IncSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Geothermal source: “Geothermal”
- Age
- 2 years since 2024
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Gem |
|
| Fuel burned (MMBtu), 2025 | 570,032 |
| Capacity factor, 2025 | 0.545 |
| Net generation (MWh), 2025 | 167,067 |
| Balancing authority code | NEVP |
Solar array
Solar array
The array area counts panels and inverters only, not buildings, fences or the whole site.
- Array area (acres)
- 38.5
- AC capacity (MW)
- 35
- DC capacity (MW)
- 35
- Site type
- Greenfield
- Began operating
- 2025
Retirement
EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.- Capacity retired
- 20.6 MW
- Generators retired
- 2
- Capacity still in service
- 35 MW
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| GEN1 | Geothermal | 17 MW | Retired | May 2024 |
| GEN2 | Geothermal | 3.6 MW | Retired | May 2024 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 66 kV
- Transmission or distribution system owner
- Sierra Pacific Power Co
- Balancing authority
- Nevada Power Company
- NERC region
- WECC
Transmission lines within 25 km (1)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Units GEN1, GEN2 scheduled to retire, 20.6 MW · EIA-860M
- In service · EIA-860M
Sources
6 sourcesSources EIA-860M · GEM · LBNL · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- USPVDBMap services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| TS Power Plant Postponed | Oil | 22.5 km | 167.6 |
| Crescent Valley Solar Postponed | Solar | 24.5 km | 149 |
| Lovelock Solar Postponed | Solar | 24.5 km | 190 |
Sources EIA-860M