Show on map
Beowawe — Power plant · Geothermal · Ormat Nevada IncTS Power Plant — Postponed · Oil · NV · 167.6 MW · 22.5 km awayCrescent Valley Solar — Postponed · Solar · NV · 149 MW · 24.5 km awayLovelock Solar — Postponed · Solar · NV · 190 MW · 24.5 km away
  • Clean firm
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Geothermal

Key facts

Power plant · Geothermalran 35% of 2024 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2024
Net generation, 2024
107,208 MWh
Grid
66 kV to Sierra Pacific Power Co (NEVP)
Location
Lander County, Nevada
Operated by
Ormat Nevada IncSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2024

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Geothermal source: “Geothermal”
Age
2 years since 2024
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100001019497
Location id
L100001017510
Eia plant ids
10287
Fuel burned (MMBtu), 2025570,032
Capacity factor, 20250.545
Net generation (MWh), 2025167,067
Balancing authority codeNEVP

Solar array

Array area (acres)
38.5
AC capacity (MW)
35
DC capacity (MW)
35
Site type
Greenfield
Began operating
2025

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Retirement

EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.
Capacity retired
20.6 MW
Generators retired
2
Capacity still in service
35 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
GEN1Geothermal17 MWRetiredMay 2024
GEN2Geothermal3.6 MWRetiredMay 2024

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
66 kV
Transmission or distribution system owner
Sierra Pacific Power Co
Balancing authority
Nevada Power Company
NERC region
WECC
Transmission lines within 25 km (1)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units GEN1, GEN2 scheduled to retire, 20.6 MW · EIA-860M
  • In service · EIA-860M

Sources

6 sources

Sources EIA-860M · GEM · LBNL · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • LBNLOpen license, with credit · retrieved Nov 9, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
TS Power Plant Postponed Oil 22.5 km 167.6
Crescent Valley Solar Postponed Solar 24.5 km 149
Lovelock Solar Postponed Solar 24.5 km 190

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution