Berlin
Power plant · Oil
Key facts
Power plant · Oilran 0% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1961
- Net generation, 2025
- 59 MWh
- Grid
- 25 kV, 14 kV to Town of Berlin - (MD) (PJM)
- Location
- Worcester County, Maryland
- Operated by
- Town of Berlin - (MD)SourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Gas
- Oil
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Oil source: “Petroleum Liquids”
- Age
- 65 years since 1961
- Unused energy
- 49 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Fuel burned (MMBtu), 2025 | 4,201 |
| Capacity factor, 2025 | 0.001 |
| Net generation (MWh), 2025 | 59 |
| Balancing authority code | PJM |
Data notes (1)
- Heat rate (Btu/kWh), 2025 not shown: computed 71203.4 outside 5000-30000 Btu/kWh
Retirement
EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.- Capacity retired
- 5.4 MW
- Generators retired
- 3
- Capacity still in service
- 5.6 MW
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 3A | Petroleum Liquids | 1.8 MW | Retired | June 2004 |
| 2A | Petroleum Liquids | 1.8 MW | Retired | June 2019 |
| 4A | Petroleum Liquids | 1.8 MW | Retired | May 2020 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 25 kV, 14 kV
- Transmission or distribution system owner
- Town of Berlin - (MD)
- Balancing authority
- PJM Interconnection, LLC
- NERC region
- RFC
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Unit 4A scheduled to retire, 1.8 MW · EIA-860M
- Stated Unit 2A scheduled to retire, 1.8 MW · EIA-860M
- Stated Unit 3A scheduled to retire, 1.8 MW · EIA-860M
- In service · EIA-860M
Sources
3 sourcesSources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Berlin Postponed | Oil | 0.0 km | 12.5 |