Show on map
Berrywood 138 kV line — Transmission lineCITI MIDWEST DATA CENTER — Built · Large load · OH · 3.6 mi awayCOLOGIX — Built · Large load · OH · 10.2 mi awayHarvey Solar — Permitted · Solar · OH · 350 MW · 14.1 mi awaySTACK NAL01B (New Albany data centre) — Filed · Large load · OH · 14.6 mi awayCMH086 CAMPUS — Built · Large load · OH · 14.7 mi away
  • Wind & solar
  • Loads
  • In development
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Berrywood 138 kV line

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
138 kV
States crossed
US-OH

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
1
Substations at the ends (as the source names them)
Berrywood
All 2 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
HIFLD line ID159338
Voltage class100-161 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
CITI MIDWEST DATA CENTER Built Large load 3.6 mi
COLOGIX Built Large load 10.2 mi
Harvey Solar Permitted Solar 14.1 mi 350
STACK NAL01B (New Albany data centre) Filed Large load 14.6 mi
CMH086 CAMPUS Built Large load 14.7 mi

Sources EPA ICIS-Air · EIA-860M · FAA OE/AAA

Sources

Attribution