Bethany
Power plant · Oil
Key facts
Power plant · Oilran 0% of 2012 Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1948
- Net generation, 2012
- 53 MWh
- Location
- Harrison County, Missouri
- Operated by
- City of Bethany - (MO)SourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Oil
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Oil source: “Petroleum Liquids”
- Age
- 78 years since 1948
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Balancing authority code | MPS |
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- October 2012
- First unit retired
- March 2006
- Capacity retired
- 8 MW
- Generators retired
- 6
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 8 | Petroleum Liquids | 1.6 MW | Retired | March 2006 |
| 2 | Petroleum Liquids | 0.8 MW | Retired | January 2008 |
| 4 | Petroleum Liquids | 1.8 MW | Retired | October 2012 |
| 5 | Petroleum Liquids | 1.8 MW | Retired | October 2012 |
| 6 | Petroleum Liquids | 0.9 MW | Retired | October 2012 |
| 7 | Petroleum Liquids | 1.1 MW | Retired | October 2012 |
Grid
EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).- Balancing authority
- MPS
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Units 4, 5, 6, 7 scheduled to retire, 5.6 MW · EIA-860M
- Stated Unit 2 scheduled to retire, 0.8 MW · EIA-860M
- Stated Unit 8 scheduled to retire, 1.6 MW · EIA-860M
- In service · EIA-860M
Sources
3 sourcesSources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory