Show on map
Bethany — Power plant · Oil · City of Bethany - (MO)
  • Combustion
  • Retired
  • 10 · 100 · 1,000 MW

Power plant · Oil

Key facts

Power plant · Oilran 0% of 2012 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1948
Net generation, 2012
53 MWh
Location
Harrison County, Missouri
Operated by
City of Bethany - (MO)SourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2012
Fuel burned MMBtu by year, 2001 to 2012
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Oil source: “Petroleum Liquids”
Age
78 years since 1948
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Balancing authority codeMPS

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
October 2012
First unit retired
March 2006
Capacity retired
8 MW
Generators retired
6
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
8Petroleum Liquids1.6 MWRetiredMarch 2006
2Petroleum Liquids0.8 MWRetiredJanuary 2008
4Petroleum Liquids1.8 MWRetiredOctober 2012
5Petroleum Liquids1.8 MWRetiredOctober 2012
6Petroleum Liquids0.9 MWRetiredOctober 2012
7Petroleum Liquids1.1 MWRetiredOctober 2012

Grid

EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).
Balancing authority
MPS
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units 4, 5, 6, 7 scheduled to retire, 5.6 MW · EIA-860M
  • Stated Unit 2 scheduled to retire, 0.8 MW · EIA-860M
  • Stated Unit 8 scheduled to retire, 1.6 MW · EIA-860M
  • In service · EIA-860M