Show on map
Bishopville Solar II, LLC — Power plant · Solar · Bishopville Solar II, LLCShorthorn Solar — Permitted · Solar · SC · 60 MW · 4.8 mi awayMadison Solar — Postponed · Solar · SC · 10.9 MW · 11.5 mi awayMiddleton Solar — Postponed · Solar · SC · 2 MW · 12.3 mi awayDadswell Solar — Postponed · Solar · SC · 1 MW · 13.1 mi awayFairfield Solar — Postponed · Solar · SC · 10 MW · 14.1 mi awayFishwater Solar — Postponed · Solar · SC · 2 MW · 14.4 mi awayRobinson Solar Plant — Filed · Solar · SC · 76 MW · 14.6 mi away
  • Wind & solar
  • In development
  • Operating
  • 10 · 100 · 1,000 MW

Bishopville Solar II, LLC

Power plant · Solar

Key facts

Power plant · Solarran 18% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2022
Net generation, 2025
16,137 MWh
Grid
23 kV to Duke Energy Progress - (NC) (CPLE)
Location
Lee County, South Carolina
Operated by
Bishopville Solar II, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2022 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
4 years since 2022
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000838302
Location id
L100000832711
Eia plant ids
65781
Grid
Nerc region
SERC
Report year
2025
Grid voltage kv
23
Transmission owner
Duke Energy Progress - (NC)
Balancing authority code
CPLE
Balancing authority name
Duke Energy Progress East
Fuel burned (MMBtu), 202555,059
Capacity factor, 20250.184
Net generation (MWh), 202516,137
Balancing authority codeCPLE

Solar arrays

Array area (acres)
48.7
AC capacity (MW)
10
DC capacity (MW)
11.9
Mounting
Single-axis tracking
Site type
Greenfield
Began operating
2023

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Shorthorn Solar Permitted Solar 4.8 mi 60
Madison Solar Postponed Solar 11.5 mi 10.9
Middleton Solar Postponed Solar 12.3 mi 2
Dadswell Solar Postponed Solar 13.1 mi 1
Fairfield Solar Postponed Solar 14.1 mi 10
Fishwater Solar Postponed Solar 14.4 mi 2
Robinson Solar Plant Filed Solar 14.6 mi 76

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution