Show on map
Blacksand Generating Facility — Power plant · Gas, combustion turbine · Bridge Energy LLCMarici — Storage · CA · 400 MW · 11.8 km awayCPA 3777 Workman — Solar · CA · 1.9 MW · 19.7 km awayGabriel — Storage · CA · 400 MW · 22.4 km awayWestminster Reliability Project, LLC — Storage · CA · 110 MW · 22.9 km awaySanta Ana Storage 3 — Storage · CA · 40 MW · 24.2 km away
  • Combustion
  • Storage
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Blacksand Generating Facility

Power plant · Gas, combustion turbine

Key facts

Power plant · Gas, combustion turbineran 36% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2000
Net generation, 2025
30,518 MWh
Grid
12 kV to Southern California Edison Co (CISO)
Location
Orange County, California
Operated by
Bridge Energy LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2003 to 2025
Fuel burned MMBtu by year, 2003 to 2025
  • Gas

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
Age
26 years since 2000
Unused energy
54 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
16,095 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
12
Transmission owner
Southern California Edison Co
Balancing authority code
CISO
Balancing authority name
California Independent System Operator
Fuel burned (MMBtu), 2025491,195
Capacity factor, 20250.363
Heat rate (Btu/kWh), 202516,095.3
Net generation (MWh), 202530,518
Balancing authority codeCISO

Timeline

  • In service · EIA-860M

Sources

3 sources

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Marici Under construction Storage 11.8 km 400
CPA 3777 Workman Postponed Solar 19.7 km 1.9
Gabriel Under construction Storage 22.4 km 400
Westminster Reliability Project, LLC Under construction Storage 22.9 km 110
Santa Ana Storage 3 Postponed Storage 24.2 km 40

Sources EIA-860M · CAISO

Sources

Attribution