Bloom — Power plant · Oil · Midwest Generations EME LLCDes Plaines 11-SLCHI211 — Solar · IL · 1.6 MW · 6.0 km awayCloud HQ- ORD — Large load · IL · 7.2 km awayTUR VENTURES LLC — Large load · IL · 7.5 km awayPrime Data Center — Large load · IL · 8.4 km awayCLOUD HQ DATA CENTER — Large load · IL · 8.5 km awayMelrose Park 2-SLCHI547 — Solar · IL · 3 MW · 8.5 km awaySTREAM DATA CENTERS ORDC CAMPUS — Large load · IL · 8.6 km awayData Center 901 Busse Road Elk Grove — Large load · IL · 8.8 km awayEDGECONNEX — Large load · IL · 8.9 km awayElk Grove 1-SLCHI701 — Solar · IL · 1.7 MW · 9.0 km awaySTREAM DATA CENTERS — Large load · IL · 9.1 km awayCHI12 Data Center — Large load · IL · 9.1 km awayEDGECONNEX — Large load · IL · 9.1 km awayELK GROVE VILLAGE (CHI10-11-12) DATA CENTER — Large load · IL · 9.2 km awayEquinix CH5 Chiller — Large load · IL · 9.2 km awayEQUINIX CH-5 DATA CENTER — Large load · IL · 9.3 km awayAligned Data Centers ORD04 — Large load · IL · 9.4 km awayADP — Large load · IL · 9.4 km awayT5@CHICAGO II LP — Large load · IL · 9.5 km awayElk Grove 51-SLCHI151 — Solar · IL · 1.4 MW · 9.6 km awayBensenville Ind Park 11 — Solar · IL · 1.2 MW · 10.1 km awayBensenville Ind Park 12-SLCHI412 — Solar · IL · 1.1 MW · 10.1 km awayBensenville Ind Park 10-SLCHI410 — Solar · IL · 1.2 MW · 10.3 km awayMobile Crane - Unit (Chicago data centre) — Large load · IL · 10.3 km awayBensenville 13-SLCHI513 — Solar · IL · 1.4 MW · 10.3 km away2425 BUSSE ROAD LLC — Large load · IL · 10.3 km awayBensenville Ind Park 6-SLCHI406 — Solar · IL · 1.1 MW · 10.3 km awayELK GROVE VILLAGE (CH1-CH2-CH3) DATA CENTER — Large load · IL · 10.4 km awayBensenville 14-SLCHI414 — Solar · IL · 1.3 MW · 10.4 km awayDIPPER VENTURES LLC CH3 DATA CENTER — Large load · IL · 10.6 km awayBensenville Ind Park 4-SLCHI424 — Solar · IL · 1.7 MW · 10.6 km awayBensenville Ind Park 2-SLCHI402 — Solar · IL · 1.1 MW · 10.7 km awayELK GROVE DATA CENTER LLC — Large load · IL · 11.2 km awayCyrus One V3 Point 1 — Large load · IL · 11.8 km awayBensenville 2-SLCHI526 — Solar · IL · 1.9 MW · 11.9 km awayCHICAGO ENTERPRISE LLC — Large load · IL · 11.9 km awayFranklin Park 2-SLCHI802 — Solar · IL · 1.2 MW · 12.3 km awayW Belmont Ave — Solar · IL · 1.4 MW · 13.3 km awayCopenhagen Ct — Solar · IL · 3.5 MW · 13.7 km awayNTT Data Centers — Large load · IL · 13.8 km awayT5 Data Center Northlake — Large load · IL · 14.1 km awayT5@CHICAGO III LP — Large load · IL · 14.2 km awayDLR 9311 (Franklin Park data centre) — Large load · IL · 14.3 km awayFRANKLIN PARK (CHI22) DATA CENTER — Large load · IL · 14.4 km awayDIGITAL GRAND AVENUE 3 LLC — Large load · IL · 14.7 km awayNorthlake 5-SLCHI305 — Solar · IL · 2.5 MW · 14.8 km awayMICROSOFT CORP-CHICAGO DATA CENTER — Large load · IL · 15.0 km awayNorthlake 4-SLCHI304 — Solar · IL · 1.4 MW · 15.4 km awayNALCO WATER — Large load · IL · 15.7 km awayNorthlake 3-SLCHI303 — Solar · IL · 1.6 MW · 15.8 km away
  • Combustion
  • Wind & solar
  • Loads
  • In development
  • Under construction
  • Operating
  • Retired
  • Stage not stated
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Oil

Key facts

Power plant · Oil Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1971
Net generation, 2002
0 MWh
Location
Cook County, Illinois
Operated by
Midwest Generations EME LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2003
Fuel burned MMBtu by year, 2001 to 2003
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Oil source: “Petroleum Liquids”
Age
55 years since 1971

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
January 2003
Capacity retired
152 MW
Generators retired
8
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
331Petroleum Liquids19 MWRetiredJanuary 2003
332Petroleum Liquids19 MWRetiredJanuary 2003
333Petroleum Liquids19 MWRetiredJanuary 2003
334Petroleum Liquids19 MWRetiredJanuary 2003
341Petroleum Liquids19 MWRetiredJanuary 2003
342Petroleum Liquids19 MWRetiredJanuary 2003
343Petroleum Liquids19 MWRetiredJanuary 2003
344Petroleum Liquids19 MWRetiredJanuary 2003

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
NERC region
RFC
Transmission lines within 25 km (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units 331, 332, 333, 334, 341, 342, 343, 344 scheduled to retire, 152 MW · EIA-860M
  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Des Plaines 11-SLCHI211 Under construction Solar 6.0 km 1.6
Cloud HQ- ORD Filed Large load 7.2 km
TUR VENTURES LLC Built Large load 7.5 km
Prime Data Center Built Large load 8.4 km
CLOUD HQ DATA CENTER Built Large load 8.5 km
Melrose Park 2-SLCHI547 Under construction Solar 8.5 km 3
STREAM DATA CENTERS ORDC CAMPUS Built Large load 8.6 km
Data Center 901 Busse Road Elk Grove Filed Large load 8.8 km
EDGECONNEX × 2 units Built Large load 8.9 km
Elk Grove 1-SLCHI701 Under construction Solar 9.0 km 1.7
STREAM DATA CENTERS Built Large load 9.1 km
CHI12 Data Center Filed Large load 9.1 km
ELK GROVE VILLAGE (CHI10-11-12) DATA CENTER Unknown Large load 9.2 km
Equinix CH5 Chiller Built Large load 9.2 km
EQUINIX CH-5 DATA CENTER Built Large load 9.3 km
Aligned Data Centers ORD04 Under construction Large load 9.4 km
ADP Built Large load 9.4 km
T5@CHICAGO II LP Built Large load 9.5 km
Elk Grove 51-SLCHI151 Under construction Solar 9.6 km 1.4
Bensenville Ind Park 11 Under construction Solar 10.1 km 1.2
Bensenville Ind Park 12-SLCHI412 Postponed Solar 10.1 km 1.1
Bensenville Ind Park 10-SLCHI410 Under construction Solar 10.3 km 1.2
Mobile Crane - Unit (Chicago data centre) Filed Large load 10.3 km
Bensenville 13-SLCHI513 Under construction Solar 10.3 km 1.4
2425 BUSSE ROAD LLC Built Large load 10.3 km
Bensenville Ind Park 6-SLCHI406 Postponed Solar 10.3 km 1.1
ELK GROVE VILLAGE (CH1-CH2-CH3) DATA CENTER Built Large load 10.4 km
Bensenville 14-SLCHI414 Under construction Solar 10.4 km 1.3
DIPPER VENTURES LLC CH3 DATA CENTER Built Large load 10.6 km
Bensenville Ind Park 4-SLCHI424 Under construction Solar 10.6 km 1.7
Bensenville Ind Park 2-SLCHI402 Under construction Solar 10.7 km 1.1
ELK GROVE DATA CENTER LLC Unknown Large load 11.2 km
Cyrus One V3 Point 1 Under construction Large load 11.8 km
Bensenville 2-SLCHI526 Under construction Solar 11.9 km 1.9
CHICAGO ENTERPRISE LLC Built Large load 11.9 km
Franklin Park 2-SLCHI802 Under construction Solar 12.3 km 1.2
W Belmont Ave Under construction Solar 13.3 km 1.4
Copenhagen Ct Under construction Solar 13.7 km 3.5
NTT Data Centers Built Large load 13.8 km
T5 Data Center Northlake Filed Large load 14.1 km
T5@CHICAGO III LP Built Large load 14.2 km
DLR 9311 (Franklin Park data centre) Filed Large load 14.3 km
FRANKLIN PARK (CHI22) DATA CENTER Built Large load 14.4 km
DIGITAL GRAND AVENUE 3 LLC Built Large load 14.7 km
Northlake 5-SLCHI305 Under construction Solar 14.8 km 2.5
MICROSOFT CORP-CHICAGO DATA CENTER Built Large load 15.0 km
Northlake 4-SLCHI304 Under construction Solar 15.4 km 1.4
NALCO WATER Built Large load 15.7 km
Northlake 3-SLCHI303 Under construction Solar 15.8 km 1.6