- Wind & solar
- Operating
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Operating
Blue Elk III Solar, LLC: location. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Blue Elk III Solar, LLC
Power plant · Solar
Key facts
Power plant · Solarran 21% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2023
- Net generation, 2025
- 36,883 MWh
- Grid
- 46 kV to Consumers Energy Co (MISO)
- Location
- Ingham County, Michigan
- Operated by
- Blue Elk III Solar, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Operations
- Net generation, 2025
- 36,883
MWh - Fuel burned, 2025
- 125,845
MMBtu - Capacity factor, 2025
- 21.1
% - Heat rate, 2025
- Not stated
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2025 | 36,883 | 125,845 | 21.1% | — |
| 2024 | 36,384 | 124,142 | 20.7% | — |
| 2023 | 433 | 1,477 | 0.2% | — |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.