Show on map
- Wind & solar
- Loads
- In development
- Under construction
- Operating
- Size not stated
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Loads
- In development
- Under construction
- Operating
- Size not stated
Blue Elk IV Solar, LLC: location and 2 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Blue Elk IV Solar, LLC
Power plant · Solar
Key facts
Power plant · Solarran 21% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2023
- Net generation, 2025
- 37,437 MWh
- Grid
- 46 kV to Consumers Energy Co (MISO)
- Location
- Lenawee County, Michigan
- Operated by
- Blue Elk IV Solar, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Solar source: “Solar Photovoltaic”
- Age
- 3 years since 2023
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Grid |
|
| Fuel burned (MMBtu), 2025 | 127,734 |
| Capacity factor, 2025 | 0.214 |
| Net generation (MWh), 2025 | 37,437 |
| Balancing authority code | MISO |
Solar arrays
Solar arrays
The array area counts panels and inverters only, not buildings, fences or the whole site.
- Array area (acres)
- 106.3
- AC capacity (MW)
- 20
- DC capacity (MW)
- 27.2
- Mounting
- Single-axis tracking
- Site type
- Greenfield
- Began operating
- 2023
Timeline
- In service · EIA-860M
Sources
4 sourcesSources EIA-860M · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- USPVDBMap services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Beecher Solar Park Under construction | Solar | 6.2 mi | 80 |
| The Barn (Saline data centre) Filed | Large load | 14.1 mi |
Sources EIA-860M · FAA OE/AAA