Show on map
Blue Island - Burnham 345 kV — Transmission lineRobbins Community Power LLC — Postponed · Biomass · IL · 55 MW · 2.0 mi awayW 167th St — Under construction · Solar · IL · 1.5 MW · 3.2 mi awayIL - SMHEC - Moraine Valley — Postponed · Solar · IL · 1.3 MW · 9.4 mi awaySteger — Under construction · Solar · IL · 2 MW · 11.3 mi awayITT Cogen Facility — Under construction · Gas, reciprocating engine · IL · 8.2 MW · 12.3 mi awayHYDRAVAULT LLC — Built · Large load · IL · 13.1 mi awayQUALITY TECHNOLOGY SERVICES LLC — Built · Large load · IL · 13.1 mi awayEQUINIX LLC — Built · Large load · IL · 13.6 mi awayMcCook 2-SLCHI102 — Under construction · Solar · IL · 2 MW · 13.8 mi awayFalconhead Solar, LLC — Under construction · Solar · IL · 5 MW · 14.1 mi awayTIERPOINT ILLINOIS LLC — Built · Large load · IL · 14.9 mi away
  • Combustion
  • Wind & solar
  • Loads
  • Under construction
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Blue Island - Burnham 345 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
345 kV
States crossed
US-IL
Owner (as stated)
Commonwealth Edison

Details

Who’s behind it

Owner
Commonwealth Edison

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
8
Substations at the ends (as the source names them)
Blue Island to Burnham
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itcommonwealth edison
HIFLD line ID116039
Voltage class345 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Robbins Community Power LLC Postponed Biomass 2.0 mi 55
W 167th St Under construction Solar 3.2 mi 1.5
IL - SMHEC - Moraine Valley Postponed Solar 9.4 mi 1.3
Steger Under construction Solar 11.3 mi 2
ITT Cogen Facility Under construction Gas, reciprocating engine 12.3 mi 8.2
HYDRAVAULT LLC Built Large load 13.1 mi
QUALITY TECHNOLOGY SERVICES LLC Built Large load 13.1 mi
EQUINIX LLC Built Large load 13.6 mi
McCook 2-SLCHI102 Under construction Solar 13.8 mi 2
Falconhead Solar, LLC Under construction Solar 14.1 mi 5
TIERPOINT ILLINOIS LLC Built Large load 14.9 mi

Sources EIA-860M · EPA ICIS-Air

Sources