Show on map
Blue Valley — Power plant · Gas, steam turbine · City of Independence - (MO)ORACLE LEE'S SUMMIT DATA CENTER — Built · Large load · MO · 12.0 mi awayORACLE KC-7/8 DATA CENTERS — Built · Large load · MO · 12.2 mi awayORACLE 3200 DATA CENTER — Built · Large load · MO · 12.2 mi awayCUBE NA DATA CENTER COMPANY LLC — Built · Large load · MO · 13.5 mi away
  • Combustion
  • Loads
  • Operating
  • Retired
  • Size not stated
  • 10 · 100 · 1,000 MW

Blue Valley

Power plant · Gas, steam turbine

Key facts

Power plant · Gas, steam turbine Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1958
Net generation, 2021
0 MWh
Grid
14 kV to City of Independence - (MO) (SWPP)
Location
Jackson County, Missouri

Output

Net generation MWh by year, 2001 to 2021
Fuel burned MMBtu by year, 2001 to 2021
  • Gas
  • Coal
  • Oil

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, steam turbine source: “Natural Gas Steam Turbine”
Age
68 years since 1958
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110041172557
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1007421
Balancing authority codeSWPP

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
June 2020
First unit retired
February 2014
Capacity retired
176 MW
Generators retired
4
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
GT1Natural Gas Fired Combustion Turbine61 MWRetiredFebruary 2014
2Natural Gas Steam Turbine25 MWRetiredJune 2020
3Natural Gas Steam Turbine65 MWRetiredJune 2020
ST1Natural Gas Steam Turbine25 MWRetiredJune 2020
By technology
Nameplate capacity retired or scheduled to retire, by technology
TechnologyRetiredScheduled to retire
Natural Gas Steam Turbine115 MW
Natural Gas Fired Combustion Turbine61 MW

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
14 kV
Transmission or distribution system owner
City of Independence - (MO)
Balancing authority
Southwest Power Pool
NERC region
MRO
Transmission lines within 15 mi (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
City of Independence - (MO) Operator EIA-860M
CITY OF INDEPENDENCE MISSOURI Owner 100.0% Dec 31, 2023 EPA GHGRP

Timeline

  • Stated Units 2, 3, ST1 scheduled to retire, 115 MW · EIA-860M
  • Stated Unit GT1 scheduled to retire, 61 MW · EIA-860M
  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
ORACLE LEE'S SUMMIT DATA CENTER Built Large load 12.0 mi
ORACLE KC-7/8 DATA CENTERS Built Large load 12.2 mi
ORACLE 3200 DATA CENTER Built Large load 12.2 mi
CUBE NA DATA CENTER COMPANY LLC Built Large load 13.5 mi

Sources EPA ICIS-Air

Sources

Attribution