Blue Valley: location and 4 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Blue Valley
Power plant · Gas, steam turbine
Key facts
Power plant · Gas, steam turbine Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1958
- Net generation, 2021
- 0 MWh
- Grid
- 14 kV to City of Independence - (MO) (SWPP)
- Location
- Jackson County, Missouri
- Operated by
- City of Independence - (MO)
Output
- Gas
- Coal
- Oil
Details
Who’s behind it
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Gas, steam turbine source: “Natural Gas Steam Turbine”
- Age
- 68 years since 1958
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| EPA greenhouse gas reporting (GHGRP) |
|
| Balancing authority code | SWPP |
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- June 2020
- First unit retired
- February 2014
- Capacity retired
- 176 MW
- Generators retired
- 4
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| GT1 | Natural Gas Fired Combustion Turbine | 61 MW | Retired | February 2014 |
| 2 | Natural Gas Steam Turbine | 25 MW | Retired | June 2020 |
| 3 | Natural Gas Steam Turbine | 65 MW | Retired | June 2020 |
| ST1 | Natural Gas Steam Turbine | 25 MW | Retired | June 2020 |
By technology
| Technology | Retired | Scheduled to retire |
|---|---|---|
| Natural Gas Steam Turbine | 115 MW | |
| Natural Gas Fired Combustion Turbine | 61 MW |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 14 kV
- Transmission or distribution system owner
- City of Independence - (MO)
- Balancing authority
- Southwest Power Pool
- NERC region
- MRO
Transmission lines within 15 mi (10)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Ownership
2 companies2| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| City of Independence - (MO) | Operator | EIA-860M | ||
| CITY OF INDEPENDENCE MISSOURI | Owner | 100.0% | Dec 31, 2023 | EPA GHGRP |
Timeline
- Stated Units 2, 3, ST1 scheduled to retire, 115 MW · EIA-860M
- Stated Unit GT1 scheduled to retire, 61 MW · EIA-860M
- In service · EIA-860M
Sources
5 sourcesSources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Sources
- EIA-860M
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| ORACLE LEE'S SUMMIT DATA CENTER Built | Large load | 12.0 mi | |
| ORACLE KC-7/8 DATA CENTERS Built | Large load | 12.2 mi | |
| ORACLE 3200 DATA CENTER Built | Large load | 12.2 mi | |
| CUBE NA DATA CENTER COMPANY LLC Built | Large load | 13.5 mi |
Sources EPA ICIS-Air