Show on map
Bluestone Solar — Power plant · Solar · Bluestone Farm Solar, LLCMicrosoft Corporation - LYH03 Datacenter — Filed · Large load · VA · 2.9 mi awayMICROSOFT CORPORATION - TIMBER DATA CENTER — Built · Large load · VA · 10.3 mi awayBN80 DATA CENTER — Built · Large load · VA · 10.7 mi awayMICROSOFT CORPORATION - EAST COAST DATA CENTER — Built · Large load · VA · 11.2 mi awayClover Creek Solar — Under construction · Solar · VA · 77.2 MW · 11.6 mi awayMICROSOFT CORP - LYH10 DATACENTER — Built · Large load · VA · 11.7 mi awayMICROSOFT AVC19 DATA CENTER AUXILIARY SITE — Under construction · Large load · VA · 11.9 mi awayMICROSOFT CORP - LVL DATA CENTER — Built · Large load · VA · 12.3 mi awayMICROSOFT CORP - AVC17 DATACENTER — Built · Large load · VA · 12.5 mi awayTECFUSIONS CLARKSVILLE LLC — Built · Large load · VA · 14.9 mi away
  • Wind & solar
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Bluestone Solar

Power plant · Solar

Key facts

Power plant · Solarran 19% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2021
Net generation, 2025
82,073 MWh
Grid
115 kV to Virginia Electric & Power Co (PJM)
Location
Mecklenburg County, Virginia
Operated by
Bluestone Farm Solar, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2021 to 2026

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
5 years since 2021
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000805821
Location id
L100000805050
Eia plant ids
62950
Grid
Nerc region
SERC
Report year
2025
Grid voltage kv
115
Transmission owner
Virginia Electric & Power Co
Balancing authority code
PJM
Balancing authority name
PJM Interconnection, LLC
Fuel burned (MMBtu), 2025280,033
Capacity factor, 20250.188
Net generation (MWh), 202582,073
Balancing authority codePJM

Solar arrays

Array area (acres)
195.5
AC capacity (MW)
49.9
DC capacity (MW)
70
Mounting
Single-axis tracking
Site type
Greenfield
Began operating
2021

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Microsoft Corporation - LYH03 Datacenter Filed Large load 2.9 mi
MICROSOFT CORPORATION - TIMBER DATA CENTER Built Large load 10.3 mi
BN80 DATA CENTER Built Large load 10.7 mi
MICROSOFT CORPORATION - EAST COAST DATA CENTER Built Large load 11.2 mi
Clover Creek Solar Under construction Solar 11.6 mi 77.2
MICROSOFT CORP - LYH10 DATACENTER Built Large load 11.7 mi
MICROSOFT AVC19 DATA CENTER AUXILIARY SITE Under construction Large load 11.9 mi
MICROSOFT CORP - LVL DATA CENTER Built Large load 12.3 mi
MICROSOFT CORP - AVC17 DATACENTER Built Large load 12.5 mi
TECFUSIONS CLARKSVILLE LLC Built Large load 14.9 mi

Sources Virginia DEQ · EPA ICIS-Air · EPA ICIS-NPDES · EIA-860M

Sources

  • Virginia DEQOpen license · retrieved Nov 4, 2026Source: Virginia Department of Environmental Quality
  • EPA ICIS-AirOpen license · retrieved Nov 8, 2026
  • EPA ICIS-NPDESOpen license · retrieved Nov 8, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution