Boulevard
Power plant · Gas, combustion turbine
Key facts
Power plant · Gas, combustion turbine Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1970
- Net generation, 2021
- -64 MWh
- Grid
- 115 kV to Georgia Power Co (SOCO)
- Location
- Chatham County, Georgia
- Operated by
- Georgia Power CoSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Gas
- Oil
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
- Age
- 56 years since 1970
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Balancing authority code | SOCO |
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- September 2022
- First unit retired
- July 2013
- Capacity retired
- 46.8 MW
- Generators retired
- 3
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 2 | Natural Gas Fired Combustion Turbine | 15.6 MW | Retired | July 2013 |
| 3 | Natural Gas Fired Combustion Turbine | 15.6 MW | Retired | July 2013 |
| 1 | Petroleum Liquids | 15.6 MW | Retired | September 2022 |
By technology
| Technology | Retired | Scheduled to retire |
|---|---|---|
| Natural Gas Fired Combustion Turbine | 31.2 MW | |
| Petroleum Liquids | 15.6 MW |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 115 kV
- Transmission or distribution system owner
- Georgia Power Co
- Balancing authority
- Southern Company Services, Inc. - Trans
- NERC region
- SERC
Transmission lines within 25 km (10)
- Dean Forest - Boulevard 230 kV
- Nd Street 115 kV line
- Dean Forest - Little Ogeechee 230 kV
- Kraft - Dean Forest 230 kV
- Grove Point Road 115 kV line
- Grove Point Road - Little Ogeechee 115 kV
- Little Ogeechee - Dorchester 230 kV
- Little Ogeechee - Meldrim 230 kV
- Little Ogeechee - Meldrim 230 kV
- Kraft - Mcintosh 230 kV
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Unit 1 scheduled to retire, 15.6 MW · EIA-860M
- Stated Units 2, 3 scheduled to retire, 31.2 MW · EIA-860M
- In service · EIA-860M
Sources
4 sourcesSources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory