Bowline Point — Power plant · Gas, steam turbine · Bowline, LLCBowline Point unit BOW3 — Postponed · Gas, combined cycle · NY · 750 MW · 0.0 mi awayORANGETOWN DATA CENTER — Built · Large load · NY · 10.7 mi awayDATA CENTER BUILDING EXPANSION — Under construction · Large load · NY · 11.7 mi awayNYSE DATA CENTER CRANE — Filed · Large load · NJ · 13.0 mi away
  • Combustion
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Bowline Point

Power plant · Gas, steam turbine

Key facts

Power plant · Gas, steam turbineran 18% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1972
Net generation, 2025
1,959,440 MWh
Grid
345 kV to Orange & Rockland Utils Inc (NYIS)
Location
Rockland County, New York
Operated by
Bowline, LLC

Output

Net generation MWh by year, 2001 to 2026
Fuel burned MMBtu by year, 2001 to 2026
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, steam turbine source: “Natural Gas Steam Turbine”
Age
54 years since 1972
Unused energy
8,920 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
10,239 Btu/kWh 2025
All 7 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
NPCC
Report year
2025
Grid voltage kv
345
Transmission owner
Orange & Rockland Utils Inc
Balancing authority code
NYIS
Balancing authority name
New York Independent System Operator
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110071160855
Subparts reported
C, D
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1000780
Fuel burned (MMBtu), 202520,062,043
Capacity factor, 20250.180
Heat rate (Btu/kWh), 202510,238.7
Net generation (MWh), 20251,959,440.0
Balancing authority codeNYIS

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Bowline, LLC Operator EIA-860M
BOWLINE GENERATING STATION, LLC Owner 100.0% Dec 31, 2023 EPA GHGRP

Timeline

  • In service · EIA-860M

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Bowline Point unit BOW3 Postponed Gas, combined cycle 0.0 mi 750
ORANGETOWN DATA CENTER Built Large load 10.7 mi
DATA CENTER BUILDING EXPANSION Under construction Large load 11.7 mi
NYSE DATA CENTER CRANE Filed Large load 13.0 mi

Sources EIA-860M · EPA ICIS-Air · EPA ICIS-NPDES · FAA OE/AAA