Brady II Wind Energy Center
Power plant · Wind
Key facts
Power plant · Windran 49% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2016
- Net generation, 2025
- 640,497 MWh
- Grid
- 230 kV to Basin Electric Power Coop (SWPP)
- Location
- Stark County, North Dakota
- Operated by
- Brady Wind II, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Operations
- Net generation, 2025
- 640,497
MWh - Fuel burned, 2025
- 2,185,376
MMBtu - Capacity factor, 2025
- 48.7
% - Heat rate, 2025
- Not stated
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2026 (8 of 12 months) | 419,282 | 1,430,590 | — | — |
| 2025 | 640,497 | 2,185,376 | 48.7% | — |
| 2024 | 632,202 | 2,157,073 | 48.0% | — |
| 2023 | 638,826 | 2,179,676 | 48.6% | — |
| 2022 | 681,369 | 2,324,832 | 51.8% | — |
| 2021 | 632,405 | 5,592,990 | 48.1% | — |
| 2020 | 681,994 | 5,979,041 | 51.8% | — |
| 2019 | 642,203 | 5,718,817 | 48.9% | — |
| 2018 | 620,345 | 5,647,620 | 47.2% | — |
| 2017 | 656,040 | 6,044,097 | 49.9% | — |
| 2016 (1 of 12 months) | 18,567 | 171,411 | — | — |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.