Show on map
Brady — Power plant · Geothermal · Ormat Nevada IncSierra Solar Hybrid — Solar · NV · 400 MW · 6.9 km away
  • Clean firm
  • Wind & solar
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Geothermal

Key facts

Power plant · Geothermalran 32% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2002
Net generation, 2025
83,281 MWh
Grid
14 kV to Sierra Pacific Power Co (NEVP)
Location
Churchill County, Nevada
Operated by
Ormat Nevada Inc

Output

Net generation MWh by year, 2003 to 2025

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Geothermal source: “Geothermal”
Age
24 years since 2002
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100001018902
Location id
L100001016915
Eia plant ids
55991
Fuel burned (MMBtu), 2025284,156
Capacity factor, 20250.322
Net generation (MWh), 202583,281
Balancing authority codeNEVP

Solar array

Array area (acres)
31.3
AC capacity (MW)
8
DC capacity (MW)
12
Mounting
Fixed tilt
Site type
Greenfield
Began operating
2023

Source USPVDB

Source

  • U.S. Large-Scale Solar Photovoltaic DatabaseOpen license · retrieved 25 Oct 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Retirement

EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.
Capacity retired
26.4 MW
Generators retired
3
Capacity still in service
29.5 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
TG-1Geothermal9.2 MWRetiredMarch 2018
TG-2Geothermal9.2 MWRetiredMarch 2018
TG-3Geothermal8 MWRetiredMarch 2018

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
14 kV
Transmission or distribution system owner
Sierra Pacific Power Co
Balancing authority
Nevada Power Company
NERC region
WECC
Transmission lines within 25 km (3)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Ormat Nevada Inc Operator EIA-860M
Brady Power Partners Owner 100.0% 31 Dec 2025 EIA-860

Timeline

  • Stated Units TG-1, TG-2, TG-3 scheduled to retire, 26.4 MW · EIA-860M
  • In service · EIA-860M

Sources

7 sources

Sources EIA-860M · GEM · LBNL · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Sierra Solar Hybrid Under construction Solar 6.9 km 400

Sources EIA-860M

Sources

Attribution