Brandywine Power Facility

Power plant · Gas, combined cycle

Key facts

Power plant · Gas, combined cycleran 28% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1996
Net generation, 2025
698,734 MWh
Grid
230 kV to Potomac Electric Power Co (PJM)
Location
Prince Georges County, Maryland

Output

Net generation MWh by year, 2001 to 2026
Fuel burned MMBtu by year, 2001 to 2026
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combined cycle source: “Natural Gas Fired Combined Cycle”
Age
30 years since 1996
Unused energy
1,831 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
8,538 Btu/kWh 2025
All 7 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
RFC
Report year
2025
Grid voltage kv
230
Transmission owner
Potomac Electric Power Co
Balancing authority code
PJM
Balancing authority name
PJM Interconnection, LLC
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110000852051
Subparts reported
C, D
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1001288
Fuel burned (MMBtu), 20255,965,821
Capacity factor, 20250.276
Heat rate (Btu/kWh), 20258,538
Net generation (MWh), 2025698,734.0
Balancing authority codePJM

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Alpha Generation Brandywine, LLC Operator EIA-860M
KMC THERMO LLC Owner 100.0% Dec 31, 2023 EPA GHGRP

Timeline

  • In service · EIA-860M

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Mattawoman Energy Center Postponed Gas, combined cycle 2.2 mi 1,008
Madison Solar 1 LLC Postponed Solar 13.1 mi 1.2

Sources EIA-860M