Show on map
Brazos Electric substation (OSM way 498377446) — Substation · Brazos ElectricDATA CENTER — Under construction · Large load · TX · 10.3 mi awayGreenalia Solar Power Misae III — Permitted · Solar · TX · 169.6 MW · 10.9 mi away
  • Wind & solar
  • Loads
  • In development
  • Under construction
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Brazos Electric substation (OSM way 498377446)

Substation

Key facts

Substation Operating
States crossed
US-TX
Operated by
Brazos Electric

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.

Capacity not stated

All 16 attributes from OpenStreetMap power network, US — transmission lines and cables (69 kV and up, or voltage not tagged) and substations, from Geofabrik's US state extracts
Attributes
AttributeValue
Osm id498377446
RegionUS-TX
Outline
Type
Polygon
Coordinates
-100.2, 34.43, -100.2, 34.43, -100.2, 34.43, -100.2, 34.43, -100.2, 34.43, -100.2, 34.43, -100.2, 34.43
Osm typeway
Voltage (kV)69
Voltage raw69000
Voltages kv69
Scope regionsUS-TX
Voltage classunder 100 kV
States crossedUS-TX
Extract regionsUS-TX
Location methodarea_centroid
Substation typedistribution
Voltage unknownNo
Coverage regionsUS-TX
Voltage assumed kvNo

Sources

1 source

Sources OpenStreetMap

© OpenStreetMap contributors

Sources

  • OpenStreetMapOpen license, with credit · retrieved Oct 10, 2026© OpenStreetMap contributors. Power lines, cables and substations filtered and reshaped by Inframation from the OpenStreetMap elements in Overture Maps' base/infrastructure theme; this derived database is available under the Open Database License 1.0 as GeoParquet files at https://tiles.inframation.io/grid/osm-power/ (latest.json names the current version's files; licence: https://www.openstreetmap.org/copyright)

Every source and license · Attribution

View at source

Around this asset

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
DATA CENTER Under construction Large load 10.3 mi
Greenalia Solar Power Misae III Permitted Solar 10.9 mi 169.6

Sources EPA ICIS-NPDES · EIA-860M

Sources

Attribution