Show on map
- Wind & solar
- Loads
- In development
- Under construction
- Size not stated
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Loads
- In development
- Under construction
- Size not stated
Greenalia Solar Power Misae III: the source's site coordinate and 3 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Greenalia Solar Power Misae III
Solar
Key facts
Solar Permitted (source status: (T) Regulatory approvals received. Not under construction) (what this status means)- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- In-service date
- (stated)
- Location
- Childress County, Texas
Details
Who’s behind it
- Developer
- Greenlia Solar Power Misae III, LLC
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Generation
- Technology
- Solar source: “Solar Photovoltaic”
- EIA plant
- 68769 generator M3GSP
Timeline
- Stated In-service date stated by EIA-860M.
- Observed as permitted in EIA-860M (source status: “(T) Regulatory approvals received. Not under construction”).
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources EIA-860M
Around this project
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| DATA CENTER Under construction | Large load | 2.8 mi | |
| Lazy U Solar 2 Studied | Solar + storage | 12.4 mi | 502 |
| Lazy U ESS 1 Studied | Solar + storage | 12.4 mi | 502 |
Sources EPA ICIS-NPDES · ERCOT · EIA-860M