- Bioenergy
- Loads
- Operating
- Size not stated
- 10 · 100 · 1,000 MW
Map
- Bioenergy
- Loads
- Operating
- Size not stated
Brevard: location and 2 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Brevard
Power plant · Biomass
Key facts
Power plant · Biomassran 36% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2008
- Net generation, 2025
- 20,127 MWh
- Grid
- 23 kV to Florida Power & Light Co (FPL)
- Location
- Brevard County, Florida
- Operated by
- NextEra Renewable Fuels, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Biomass and waste
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Biomass source: “Landfill Gas”
- Age
- 18 years since 2008
- Heat rate
- 10,237 Btu/kWh 2025
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Fuel burned (MMBtu), 2025 | 206,047 |
| Capacity factor, 2025 | 0.359 |
| Heat rate (Btu/kWh), 2025 | 10,237.3 |
| Net generation (MWh), 2025 | 20,127 |
| Balancing authority code | FPL |
Retirement
EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.- Capacity retired
- 3.2 MW
- Generators retired
- 2
- Capacity still in service
- 6.4 MW
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| ENG4 | Landfill Gas | 1.6 MW | Retired | July 2019 |
| ENG5 | Landfill Gas | 1.6 MW | Retired | May 2020 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 23 kV
- Transmission or distribution system owner
- Florida Power & Light Co
- Balancing authority
- Florida Power & Light Company
- NERC region
- SERC
Transmission lines within 25 km (10)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Unit ENG5 scheduled to retire, 1.6 MW · EIA-860M
- Stated Unit ENG4 scheduled to retire, 1.6 MW · EIA-860M
- In service · EIA-860M
Sources
4 sourcesSources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| VIERA DATA CENTER - PHASE 1 Built | Large load | 19.7 km | |
| KENNEDY DATA CENTER Built | Large load | 22.4 km |