Show on map
Brevard — Power plant · Biomass · NextEra Renewable Fuels, LLCVIERA DATA CENTER - PHASE 1 — Large load · FL · 19.7 km awayKENNEDY DATA CENTER — Large load · FL · 22.4 km away
  • Bioenergy
  • Loads
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Biomass

Key facts

Power plant · Biomassran 36% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2008
Net generation, 2025
20,127 MWh
Grid
23 kV to Florida Power & Light Co (FPL)
Location
Brevard County, Florida
Operated by
NextEra Renewable Fuels, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2017 to 2025
Fuel burned MMBtu by year, 2017 to 2025
  • Biomass and waste

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Biomass source: “Landfill Gas”
Age
18 years since 2008
Heat rate
10,237 Btu/kWh 2025
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Fuel burned (MMBtu), 2025206,047
Capacity factor, 20250.359
Heat rate (Btu/kWh), 202510,237.3
Net generation (MWh), 202520,127
Balancing authority codeFPL

Retirement

EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.
Capacity retired
3.2 MW
Generators retired
2
Capacity still in service
6.4 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
ENG4Landfill Gas1.6 MWRetiredJuly 2019
ENG5Landfill Gas1.6 MWRetiredMay 2020

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
23 kV
Transmission or distribution system owner
Florida Power & Light Co
Balancing authority
Florida Power & Light Company
NERC region
SERC
Transmission lines within 25 km (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Unit ENG5 scheduled to retire, 1.6 MW · EIA-860M
  • Stated Unit ENG4 scheduled to retire, 1.6 MW · EIA-860M
  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
VIERA DATA CENTER - PHASE 1 Built Large load 19.7 km
KENNEDY DATA CENTER Built Large load 22.4 km