Show on map
- Wind & solar
- In development
- Under construction
- Operating
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- In development
- Under construction
- Operating
Briscoe 2A: location and 5 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Briscoe 2A
Power plant · Solar
Key facts
Power plant · Solarran 27% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2023
- Net generation, 2025
- 4,703 MWh
- Grid
- 13 kV to Commonwealth Edison Co (MISO)
- Location
- LaSalle County, Illinois
- Operated by
- 7th Road Solar 2, LLC (Briscoe 2A)SourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Solar source: “Solar Photovoltaic”
- Age
- 3 years since 2023
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Gem |
|
| Grid |
|
| Fuel burned (MMBtu), 2025 | 16,047 |
| Capacity factor, 2025 | 0.268 |
| Net generation (MWh), 2025 | 4,703 |
| Balancing authority code | MISO |
Solar array
Solar array
The array area counts panels and inverters only, not buildings, fences or the whole site.
- Array area (acres)
- 10.2
- AC capacity (MW)
- 2
- DC capacity (MW)
- 2
- Mounting
- Single-axis tracking
- Site type
- Greenfield
- Began operating
- 2023
Timeline
- In service · EIA-860M
Sources
5 sourcesSources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- USPVDBMap services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Solitude Under construction | Solar | 3.0 mi | 5 |
| USS Grandpa Solar Postponed | Solar | 5.2 mi | 1 |
| SV CSG Naplate Under construction | Solar | 13.3 mi | 3.9 |
| Prairie Violet Wind LLC Postponed | Wind | 13.9 mi | 130 |
| Old Town Wind Announced | Wind | 14.8 mi | 178 |
Sources EIA-860M