Show on map
Bristol Woods Solar WI, LLC — Power plant · Solar · Wisconsin Electric Power CoIL - Renewable Properties - Bobcat - Wes — Under construction · Solar · IL · 4.5 MW · 5.5 mi awayZion Energy Center — Postponed · Gas, combustion turbine · IL · 397.8 MW · 6.1 mi awayNL IL Lake — Under construction · Solar · IL · 5 MW · 6.8 mi awayRed Oak Ridge Energy Center LLC — Studied · Gas, other · WI · 1,211.2 MW · 7.4 mi awayCenergy IL - Zion Park District — Under construction · Solar · IL · 2.3 MW · 8.6 mi away2250 (Racine data centre) — Filed · Large load · WI · 10.9 mi awayMICROSOFT CORPORATION - MKE 3B DATA CENTER — Built · Large load · WI · 11.5 mi awayMLC 300 (Racine data centre) — Filed · Large load · WI · 12.1 mi awayT5 CHI IV Data Center Buildings — Filed · Large load · IL · 14.9 mi away
  • Combustion
  • Wind & solar
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Bristol Woods Solar WI, LLC

Power plant · Solar

Key facts

Power plant · Solar Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2025
Net generation, 2025
0 MWh
Grid
25 kV to Wisconsin Electric Power Co (MISO)
Location
Kenosha County, Wisconsin
Operated by
Wisconsin Electric Power CoSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
1 year since 2025
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
RFC
Report year
2025
Grid voltage kv
24.90
Transmission owner
Wisconsin Electric Power Co
Balancing authority code
MISO
Balancing authority name
Midcontinent Independent Transmission System Operator, Inc..
Fuel burned (MMBtu), 20250
Net generation (MWh), 20250
Balancing authority codeMISO
Data notes (1)
  • Capacity factor, 2025 not shown: net generation 0.0 MWh is not positive (the plant consumed at least as much as it produced over the year)

Timeline

  • In service · EIA-860M

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
IL - Renewable Properties - Bobcat - Wes Under construction Solar 5.5 mi 4.5
Zion Energy Center Postponed Gas, combustion turbine 6.1 mi 397.8
NL IL Lake Under construction Solar 6.8 mi 5
Red Oak Ridge Energy Center LLC Studied Gas, other 7.4 mi 1,211.2
Cenergy IL - Zion Park District Under construction Solar 8.6 mi 2.3
2250 (Racine data centre) Filed Large load 10.9 mi
MICROSOFT CORPORATION - MKE 3B DATA CENTER Built Large load 11.5 mi
MLC 300 (Racine data centre) Filed Large load 12.1 mi
T5 CHI IV Data Center Buildings Filed Large load 14.9 mi

Sources EIA-860M · Berkeley Lab · FAA OE/AAA · EPA ICIS-Air

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • Berkeley LabOpen license, with credit · retrieved Nov 4, 2026Lawrence Berkeley National Laboratory and GridTracker, Queued Up data file (2026 edition), CC BY 4.0. Modified by Inframation: non-ISO and MISO regions only; MISO rows labelled with the date the file's queue data runs to; statuses and technologies mapped to Inframation's vocabulary. Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker.
  • FAA OE/AAAOpen license · retrieved Nov 16, 2026
  • EPA ICIS-AirOpen license · retrieved Nov 16, 2026

Attribution