Show on map
Bronson — Power plant · Solar · Headwater Energy, LLCOrchard BESS — Storage · TX · 10 MW · 1.2 km awayEast Bernard — Storage · TX · 9.5 MW · 9.8 km awayRaven Storage — Storage · TX · 103.5 MW · 12.3 km awayDenali Energy Storage — Storage · TX · 11 MW · 14.7 km awaySunrose Renewable Energy — Solar + storage · TX · 609.9 MW · 21.1 km away
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Solar

Key facts

Power plant · Solarran 10% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2018
Net generation, 2025
8,626 MWh
Grid
34 kV to CenterPoint Energy (ERCO)
Location
Fort Bend County, Texas
Operated by
Headwater Energy, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2018 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
8 years since 2018
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000814837
Location id
L100000812228
Eia plant ids
61868
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
34.50
Transmission owner
CenterPoint Energy
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
Fuel burned (MMBtu), 202529,431
Capacity factor, 20250.099
Net generation (MWh), 20258,626
Balancing authority codeERCO

Solar array

Array area (acres)
69.2
AC capacity (MW)
10
DC capacity (MW)
14.2
Mounting
Single-axis tracking
Site type
Greenfield
Began operating
2018

Source USPVDB

Source

  • U.S. Large-Scale Solar Photovoltaic DatabaseOpen license · retrieved 25 Oct 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Orchard BESS Under construction Storage 1.2 km 10
East Bernard Under construction Storage 9.8 km 9.5
Raven Storage Built Storage 12.3 km 103.5
Denali Energy Storage Under construction Storage 14.7 km 11
Sunrose Renewable Energy Studied Solar + storage 21.1 km 609.9

Sources EIA-860M · ERCOT

Sources

Attribution