Show on map
Brook Street 115 kV line — Transmission lineSolar Carver 3 Hybrid — Under construction · Solar + storage · MA · 2 MW · 6.8 mi awaySolar Carver 1 Hybrid — Under construction · Solar + storage · MA · 4 MW · 7.5 mi awayLogging Swamp North — Permitted · Solar · MA · 5 MW · 13.6 mi awayLogging Swamp South — Permitted · Solar · MA · 5 MW · 13.7 mi awaySnipatuit Road Solar — Under construction · Solar + storage · MA · 8 MW · 14.1 mi awayBraley Hill North Solar — Under construction · Solar + storage · MA · 10 MW · 14.3 mi awayCanal — Postponed · Gas, combustion turbine · MA · 330 MW · 14.7 mi awayFeatherbed Lane South Solar — Under construction · Solar + storage · MA · 2 MW · 14.9 mi away
  • Wind & solar
  • In development
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Brook Street 115 kV line

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
115 kV
States crossed
US-MA

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
5
Substations at the ends (as the source names them)
Brook Street
All 2 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
HIFLD line ID132551
Voltage class100-161 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Solar Carver 3 Hybrid Under construction Solar + storage 6.8 mi 2
Solar Carver 1 Hybrid Under construction Solar + storage 7.5 mi 4
Logging Swamp North Permitted Solar 13.6 mi 5
Logging Swamp South Permitted Solar 13.7 mi 5
Snipatuit Road Solar Under construction Solar + storage 14.1 mi 8
Braley Hill North Solar Under construction Solar + storage 14.3 mi 10
Canal Postponed Gas, combustion turbine 14.7 mi 330
Featherbed Lane South Solar Under construction Solar + storage 14.9 mi 2

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution