Brookhaven Facility: location and 6 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Brookhaven Facility
Power plant · Biomass
Key facts
Power plant · Biomassran 4% of 2012 Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1995
- Net generation, 2012
- 1,829 MWh
- Location
- Suffolk County, New York
- Operated by
- WEHRAN Energy CorporationSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Biomass and waste
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Biomass source: “Landfill Gas”
- Age
- 31 years since 1995
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Balancing authority code | NYIS |
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- December 2012
- First unit retired
- January 2005
- Capacity retired
- 5.2 MW
- Generators retired
- 4
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| BH1 | Landfill Gas | 1.3 MW | Retired | January 2005 |
| BH2 | Landfill Gas | 1.3 MW | Retired | December 2012 |
| BH3 | Landfill Gas | 1.3 MW | Retired | December 2012 |
| BH4 | Landfill Gas | 1.3 MW | Retired | December 2012 |
Grid
EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).- Balancing authority
- NYIS
Transmission lines within 25 km (2)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Units BH2, BH3, BH4 scheduled to retire, 3.9 MW · EIA-860M
- Stated Unit BH1 scheduled to retire, 1.3 MW · EIA-860M
- In service · EIA-860M
Sources
4 sourcesSources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Brookhaven Facility Postponed | Biomass | 0.0 km | 1 |
| NY CDG 009 Under construction | Solar | 4.9 km | 1 |
| Manorville II Filed | Solar + storage | 12.8 km | 1.4 |
| Westhampton - NY 0243 (Giaquinto 1) Under construction | Solar | 20.0 km | 5 |
| KCE NY 31, LLC Announced | Storage | 20.4 km | 50 |
| Riverhead - CVE Under construction | Solar + storage | 24.7 km | 8.9 |