Show on map
Broshco Fabricated Products — Power plant · Gas, combustion turbine · Broshco Fabricated ProductsBlack Fork Wind Energy Project — Postponed · Wind · OH · 200 MW · 11.4 mi away
  • Combustion
  • Operating
  • 10 · 100 · 1,000 MW

Broshco Fabricated Products

Power plant · Gas, combustion turbine

Key facts

Power plant · Gas, combustion turbineran 0% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2001
Net generation, 2025
193 MWh
Grid
12 kV to Ohio Edison Co (PJM)
Location
Richland County, Ohio
Operated by
Broshco Fabricated ProductsSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2013 to 2026
Fuel burned MMBtu by year, 2013 to 2026
  • Gas

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
Age
25 years since 2001
Unused energy
41 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
10,155 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
RFC
Report year
2025
Grid voltage kv
12.50
Transmission owner
Ohio Edison Co
Balancing authority code
PJM
Balancing authority name
PJM Interconnection, LLC
Fuel burned (MMBtu), 20251,960
Capacity factor, 20250.005
Heat rate (Btu/kWh), 202510,155.4
Net generation (MWh), 2025193
Balancing authority codePJM

Timeline

  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Black Fork Wind Energy Project Postponed Wind 11.4 mi 200

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution