Brush Generation Facility — Power plant · Gas, combined cycle · BRUSH POWER LLCPivot Solar 71 LLC — Solar · CO · 1.8 MW · 3.3 km awayFortress 1 — Solar + storage · CO · 398.9 MW · 5.6 km awaySouth Platte Solar — Solar · CO · 150 MW · 8.4 km awayPawnee Solar & BESS — Solar + storage · CO · 450 MW · 15.0 km awayRaceway Solar - (CO) — Solar · CO · 7 MW · 17.0 km awaySouth Platte Storage — Storage · CO · 250 MW · 22.4 km away
  • Combustion
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Brush Generation Facility

Power plant · Gas, combined cycle

Key facts

Power plant · Gas, combined cycleran 5% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1990
Net generation, 2025
126,277 MWh
Grid
115 kV to Public Service Co of Colorado (PSCO)
Location
Morgan County, Colorado
Operated by
Brush Power LLC

Output

Net generation MWh by year, 2001 to 2025
Fuel burned MMBtu by year, 2001 to 2025
  • Gas

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combined cycle source: “Natural Gas Fired Combined Cycle”
Age
36 years since 1990
Unused energy
2,269 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
10,620 Btu/kWh 2025
All 8 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Parents
Name
AltaGas Ltd
Share pct
100
Gem entity id
E100000000102
Name
Freyr Dataenergy Inc
Share pct
49.90
Gem entity id
E100002015979
Name
Mjolnir Energy Inc
Share pct
49.90
Gem entity id
E100002015980
Name
small shareholder(s)
Share pct
0.100
Gem entity id
E100001015587
Unit ids
G100000401601, G100000401602, G100000401603
Location id
L100000401524
Eia plant ids
10682
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110017431484
Subparts reported
C, D
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1001224
Eia status
By code
OP
Mw
211.6
Units
5
OS
Mw
61.80
Units
2
Standby mw
0
Status rule
some_units_retired
In service mw
273.4
Out of service mw
61.80
Fuel burned (MMBtu), 20251,341,059
Capacity factor, 20250.053
Heat rate (Btu/kWh), 202510,620
Net generation (MWh), 2025126,277
Balancing authority codePSCO

Retirement

EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.
Capacity retired
23.8 MW
Generators retired
1
Capacity still in service
273.4 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
GT2Natural Gas Fired Combustion Turbine23.8 MWRetiredJanuary 2024

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
115 kV
Transmission or distribution system owner
Public Service Co of Colorado
Balancing authority
Public Service Company of Colorado
NERC region
WECC
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

4 companies5
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
BRUSH POWER LLC Operator EIA-860M
BRUSH POWER LLC Owner 67.0% 31 Dec 2023 EPA GHGRP
CLARION ENERGY LLC Owner 33.0% 31 Dec 2023 EPA GHGRP
Global Infrastructure Partners Owner 72.9% 31 Dec 2025 EIA-860
Alliance Energy Group LLC Owner 27.1% 31 Dec 2025 EIA-860

Timeline

  • Stated Unit GT2 scheduled to retire, 23.8 MW · EIA-860M
  • In service · EIA-860M

Sources

6 sources

Sources EIA-860M · GEM · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT) · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Pivot Solar 71 LLC Under construction Solar 3.3 km 1.8
Fortress 1 Filed Solar + storage 5.6 km 398.9
South Platte Solar Under construction Solar 8.4 km 150
Pawnee Solar & BESS Under construction Solar + storage 15.0 km 450
Raceway Solar - (CO) Filed Solar 17.0 km 7
South Platte Storage Under construction Storage 22.4 km 250