Show on map
- Wind & solar
- Loads
- In development
- Under construction
- Operating
- Size not stated
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Loads
- In development
- Under construction
- Operating
- Size not stated
BT Jungmann: location and 7 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
BT Jungmann
Power plant · Solar
Key facts
Power plant · Solar Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2025
- Grid
- 69 kV to Oncor Electric Delivery Company LLC (ERCO)
- Location
- Milam County, Texas
- Operated by
- Nofar USA Energy Investments and Management, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Solar source: “Solar Photovoltaic”
- Age
- 1 year since 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Gem |
|
| Grid |
|
| Fuel burned (MMBtu), 2025 | 290,976 |
| Capacity factor, 2025 | 0.243 |
| Net generation (MWh), 2025 | 85,280 |
| Balancing authority code | ERCO |
Solar arrays
Solar arrays
The array area counts panels and inverters only, not buildings, fences or the whole site.
- Array area (acres)
- 147.3
- AC capacity (MW)
- 40
- DC capacity (MW)
- 40
- Site type
- Greenfield
- Began operating
- 2025
Timeline
- In service · EIA-860M
Sources
5 sourcesSources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- USPVDBMap services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Project Orion (Burlington data centre) Filed | Large load | 7.0 mi | |
| SB ENERGY - ORION DATA CENTER Under construction | Large load | 7.3 mi | |
| FREEBIRD DATA CENTER Under construction | Large load | 7.7 mi | |
| Hermes Storage BESS Under construction | Solar + storage | 8.1 mi | 200.8 |
| Sypert Branch Solar Built | Solar | 8.3 mi | 261.1 |
| Rosebud Solar, LLC Postponed | Solar | 11.8 mi | 132 |
| Chillingham Solar Built | Solar | 14.0 mi | 352.4 |
Sources FAA OE/AAA · EPA ICIS-NPDES · EIA-860M · ERCOT