Show on map
Buda BESS — Power plant · Storage · Buda Infra LLCMetro BESS — Studied · Storage · TX · 200.7 MW · 18.5 km awayAMD Phase 2 (Austin data centre) — Filed · Large load · TX · 21.3 km away
  • Storage
  • Loads
  • In development
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Storage

Key facts

Power plant · Storage Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2026
Grid
25 kV to Pedernales Electric Coop, Inc (ERCO)
Location
Hays County, Texas
Operated by
Buda Infra LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Storage source: “Batteries”
Age
0 years since 2026
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
24.90
Transmission owner
Pedernales Electric Coop, Inc
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
Balancing authority codeERCO

Timeline

  • In service · EIA-860M

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Metro BESS Studied Storage 18.5 km 200.7
AMD Phase 2 (Austin data centre) Filed Large load 21.3 km

Sources ERCOT · EIA-860M · FAA OE/AAA

Sources

  • ERCOTOpen license · retrieved Nov 4, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • FAA OE/AAAOpen license · retrieved Nov 9, 2026

Attribution