Buffalo Mountain — Power plant · Wind · Tennessee Valley Authority
  • Wind & solar
  • Retired
  • 10 · 100 · 1,000 MW

Buffalo Mountain

Power plant · Wind

Key facts

Power plant · Wind Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2000
Net generation, 2025
0 MWh
Grid
69 kV to Tennessee Valley Authority (TVA)
Location
Anderson County, Tennessee
Operated by
Tennessee Valley AuthoritySourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2002 to 2026

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Wind source: “Onshore Wind Turbine”
Age
26 years since 2000
All 3 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Fuel burned (MMBtu), 20250
Net generation (MWh), 20250
Balancing authority codeTVA
Data notes (1)
  • Capacity factor, 2025 not shown: net generation 0.0 MWh is not positive (the plant consumed at least as much as it produced over the year)

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
November 2021
Capacity retired
1.8 MW
Generators retired
3
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
1Onshore Wind Turbine0.6 MWRetiredNovember 2021
2Onshore Wind Turbine0.6 MWRetiredNovember 2021
3Onshore Wind Turbine0.6 MWRetiredNovember 2021

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
69 kV
Transmission or distribution system owner
Tennessee Valley Authority
Balancing authority
Tennessee Valley Authority
NERC region
SERC
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units 1, 2, 3 scheduled to retire, 1.8 MW · EIA-860M
  • In service · EIA-860M