Butler Solar Farm 20

Power plant · Solar

Key facts

Power plant · Solarran 22% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2016
Net generation, 2025
41,599 MWh
Grid
46 kV to Georgia Power Co (SOCO)
Location
Taylor County, Georgia

Output

Net generation MWh by year, 2016 to 2025

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
10 years since 2016
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
SERC
Report year
2025
Grid voltage kv
46
Transmission owner
Georgia Power Co
Balancing authority code
SOCO
Balancing authority name
Southern Company Services, Inc. - Trans
Fuel burned (MMBtu), 2025141,934
Capacity factor, 20250.216
Net generation (MWh), 202541,599
Balancing authority codeSOCO

Solar arrays

Array area (acres)
90.5
AC capacity (MW)
22
DC capacity (MW)
29
Mounting
Single-axis tracking
Site type
Greenfield
Began operating
2016

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Southern Power Co Operator EIA-860M
SP Butler Solar Farm, LLC Owner 100.0% Dec 31, 2025 EIA-860

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Sandhill Solar 2 Postponed Solar 1.3 mi 200

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution