Show on map
BWC TERMINALS LLC, MANCHESTER TERMINAL — Petroleum product terminalTexas Petrochemicals — Postponed · Gas, combined cycle · TX · 560 MW · 4.4 mi awayTX LaPort 10060 Porter Road Solar — Postponed · Solar · TX · 1.6 MW · 11.2 mi awayNET Power La Porte Station — Studied · Gas, combustion turbine · TX · 25.5 MW · 11.7 mi awayPamela Heights I Energy Center — Under construction · Storage · TX · 101.7 MW · 12.1 mi awayCallisto II Energy Center — Under construction · Storage · TX · 303.2 MW · 12.1 mi awayGreens Bayou 6 — Under construction · Gas, combustion turbine · TX · 445 MW · 13.0 mi awayTX Houston 7080 Express Lane — Postponed · Storage · TX · 1.5 MW · 13.1 mi awayBerkman Storage — Postponed · Storage · TX · 100 MW · 13.7 mi awayBocanova Energy Storage II — Under construction · Storage · TX · 150 MW · 13.8 mi away
  • Combustion
  • Storage
  • In development
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

BWC Terminals LLC, Manchester Terminal

Petroleum product terminal

As filed: BWC TERMINALS LLC, MANCHESTER TERMINAL

Key facts

Petroleum product terminal Operating
Location
Texas

Details

Who’s behind it

Owner
BWC Terminals LLCSourceEIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Capacity not stated

All 5 attributes from EIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)
Attributes
AttributeValue
Padd3
SiteMANCHESTER TERMINAL
SurveyEIA-815
Owner, as the source states itBWC TERMINALS LLC
Source release202109

Sources

2 sources

Sources EIA Energy Atlas · EIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)

Sources

Every source and license · Attribution

View at source

Around this asset

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Texas Petrochemicals Postponed Gas, combined cycle 4.4 mi 560
TX LaPort 10060 Porter Road Solar Postponed Solar 11.2 mi 1.6
NET Power La Porte Station Studied Gas, combustion turbine 11.7 mi 25.5
Pamela Heights I Energy Center Under construction Storage 12.1 mi 101.7
Callisto II Energy Center Under construction Storage 12.1 mi 303.2
Greens Bayou 6 Under construction Gas, combustion turbine 13.0 mi 445
TX Houston 7080 Express Lane Postponed Storage 13.1 mi 1.5
Berkman Storage Postponed Storage 13.7 mi 100
Bocanova Energy Storage II Under construction Storage 13.8 mi 150

Sources EIA-860M · ERCOT

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • ERCOTOpen license · retrieved Nov 4, 2026

Attribution