Byron
Power plant · Wind
Key facts
Power plant · Windran 17% of 2018 Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1999
- Net generation, 2018
- 2,081 MWh
- Grid
- 25 kV to Wisconsin Electric Power Co (MISO)
- Location
- Fond Du Lac County, Wisconsin
- Operated by
- Wisconsin Electric Power CoSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Wind source: “Onshore Wind Turbine”
- Age
- 27 years since 1999
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Balancing authority code | MISO |
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- May 2019
- Capacity retired
- 1.4 MW
- Generators retired
- 2
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 0.7 MW | Retired | May 2019 |
| 2 | Onshore Wind Turbine | 0.7 MW | Retired | May 2019 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 25 kV
- Transmission or distribution system owner
- Wisconsin Electric Power Co
- Balancing authority
- Midcontinent Independent Transmission System Operator, Inc..
- NERC region
- RFC
Transmission lines within 25 km (10)
- South Fond De Lac - Forward Energy Center 138 kV
- Butternut - Forward Energy Center 138 kV
- Auburn - Butternut 138 kV
- South Fond De Lac - Edgewater Station 345 kV
- South Fond De Lac - Martin Road 138 kV
- South Fond De Lac - Columbia 345 kV
- Ohmstead - Martin Road 138 kV
- South Fond De Lac - Fitzgerald 345 kV
- South Fond De Lac - Forest 138 kV
- Cypress 345 kV line
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Units 1, 2 scheduled to retire, 1.4 MW · EIA-860M
- In service · EIA-860M
Sources
4 sourcesSources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Campbellsport Solar WI, LLC Filed | Solar | 15.2 km | 6 |