- Combustion
- Storage
- Loads
- In development
- Under construction
- Operating
- Retired
- Stage not stated
- Size not stated
- 10 · 100 · 1,000 MW
Map
- Combustion
- Storage
- Loads
- In development
- Under construction
- Operating
- Retired
- Stage not stated
- Size not stated
C E Newman: location and 13 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
C E Newman
Power plant · Gas, steam turbine
Key facts
Power plant · Gas, steam turbine Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1957
- Net generation, 2010
- 0 MWh
- Grid
- 69 kV to City of Garland (ERCO)
- Location
- Dallas County, Texas
- Operated by
- City of Garland - (TX)
Output
- Gas
Details
Who’s behind it
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Gas, steam turbine source: “Natural Gas Steam Turbine”
- Age
- 69 years since 1957
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| EPA greenhouse gas reporting (GHGRP) |
|
| Balancing authority code | ERCO |
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- February 2011
- First unit retired
- May 2005
- Capacity retired
- 96.4 MW
- Generators retired
- 5
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 1 | Natural Gas Steam Turbine | 7.5 MW | Retired | May 2005 |
| 2 | Natural Gas Steam Turbine | 7.5 MW | Retired | May 2005 |
| 3 | Natural Gas Steam Turbine | 18.7 MW | Retired | May 2005 |
| 4 | Natural Gas Steam Turbine | 18.7 MW | Retired | May 2005 |
| 5 | Natural Gas Steam Turbine | 44 MW | Retired | February 2011 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 69 kV
- Transmission or distribution system owner
- City of Garland
- Balancing authority
- Electric Reliability Council of Texas, Inc.
- NERC region
- TRE
Transmission lines within 25 km (10)
- Garland Power & Light 138 kV line (OSM way 346508694)
- Garland Power & Light power line, voltage not stated (OSM way 346508687)
- Garland Power & Light 138 kV line (OSM way 346508695)
- Oncor 138 kV line (OSM way 343387975)
- Garland Power & Light 138 kV line (OSM way 346508720)
- 345 kV line (OSM way 172294940)
- Oncor 138 kV line (OSM way 286964715)
- 138 kV line (OSM way 286964716)
- Garland Power & Light 138 kV line (OSM way 346556634)
- Garland Power & Light 138 kV line (OSM way 284514004)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Ownership
3 companies3| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| City of Garland - (TX) | Operator | EIA-860M | ||
| Garland Power & Light | Owner | 31 Dec 2023 | EPA GHGRP | |
| City of Garland | Owner | 100.0% | 31 Dec 2023 | EPA GHGRP |
Timeline
- Stated Unit 5 scheduled to retire, 44 MW · EIA-860M
- Stated Units 1, 2, 3, 4 scheduled to retire, 52.4 MW · EIA-860M
- In service · EIA-860M
Sources
5 sourcesSources EIA-860M · OpenStreetMap · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
© OpenStreetMap contributors
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- OpenStreetMap power network, US — transmission lines and cables (69 kV and up, or voltage not tagged) and substations, from Geofabrik's US state extracts© OpenStreetMap contributors. Power lines, cables and substations filtered and reshaped by Inframation from the OpenStreetMap elements in Overture Maps' base/infrastructure theme; this derived database is available under the Open Database License 1.0 as GeoParquet files at https://tiles.inframation.io/grid/osm-power/ (latest.json names the current version's files; licence: https://www.openstreetmap.org/copyright)
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Crane DLR37 (Garland data centre) Filed | Large load | 7.7 km | |
| NTT TX-4 DATA CENTER Under construction | Large load | 8.1 km | |
| RAGINGWIRE DATA CENTER Built | Large load | 8.3 km | |
| SDC DFW-VII DATA CENTER PHASE 2 Built | Large load | 8.4 km | |
| BANK OF AMERICA - RTX MODULAR DATA CENTER Built | Large load | 8.9 km | |
| EDGECORE DATACENTER - FUJITSU CAMPUS ADDITION Unknown | Large load | 9.3 km | |
| FLEXENTIAL DATA CENTER EXPANSION Built | Large load | 11.3 km | |
| ALIGNED DATA CENTER MEMORY TECH PHASE 1 ADDITION Built | Large load | 11.8 km | |
| Boxcar Energy Storage Under construction | Storage | 15.2 km | 150 |
| EQUINIX N STEMMONS FREEWAY DALLAS Built | Large load | 22.3 km | |
| Mallard Energy Storage Under construction | Storage | 23.3 km | 250 |
| DA12 (Dallas data centre) Filed | Large load | 24.2 km | |
| EXXONMOBIL DALLAS DATA CENTER Built | Large load | 24.7 km |
Sources FAA OE/AAA · EPA ICIS-NPDES · EIA-860M · EPA ICIS-Air
Sources
- FAA OE/AAA Part 77 obstruction evaluation case archives (data-centre sites, buildings and cranes)
- EPA ECHO ICIS-NPDES construction stormwater coverage (data-centre sites, national)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EPA ECHO ICIS-Air national facility download (data-centre selection, placed through FRS)