Cachi — Power plant · Storage · ENGIE North AmericaClear Springs Energy Center — Gas, combustion turbine · TX · 549 MW · 0.4 km awayCLOUDBURST DATA CENTERS — Large load · TX · 12.3 km awayGuadalupe Generating Station — Gas, combustion turbine · TX · 320 MW · 12.7 km awayCF BESS NINE — Storage · TX · 9.9 MW · 24.3 km away
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Storage

Key facts

Power plant · Storage Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2025
Grid
138 kV to Lower Colorado River Authority (ERCO)
Location
Guadalupe County, Texas
Operated by
ENGIE North AmericaSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2025 to 2026

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Storage source: “Batteries”
Age
1 year since 2025
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
138
Transmission owner
Lower Colorado River Authority
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
Fuel burned (MMBtu), 20250
Net generation (MWh), 2025-6,148
Balancing authority codeERCO
Data notes (1)
  • Capacity factor, 2025 not shown: net generation -6148.0 MWh is not positive (the plant consumed at least as much as it produced over the year)

Timeline

  • In service · EIA-860M

Sources

3 sources

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Clear Springs Energy Center Postponed Gas, combustion turbine 0.4 km 549
CLOUDBURST DATA CENTERS Under construction Large load 12.3 km
Guadalupe Generating Station Postponed Gas, combustion turbine 12.7 km 320
CF BESS NINE Filed Storage 24.3 km 9.9