Show on map
- Combustion
- Wind & solar
- Storage
- In development
- Under construction
- Operating
- 10 · 100 · 1,000 MW
Map
- Combustion
- Wind & solar
- Storage
- In development
- Under construction
- Operating
CalPeak Power Panoche Peaker Plant: location and 5 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
CalPeak Power Panoche Peaker Plant
Power plant · Gas, combustion turbine
Key facts
Power plant · Gas, combustion turbineran 0% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2001
- Net generation, 2025
- 1,871 MWh
- Grid
- 115 kV to Pacific Gas & Electric Co (CISO)
- Location
- Fresno County, California
- Operated by
- CalPeak Power, LLC
Output
- Gas
Details
Who’s behind it
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
- Age
- 25 years since 2001
- Unused energy
- 528 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
- Heat rate
- 11,106 Btu/kWh 2025
All 8 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Gem |
|
| Grid |
|
| EPA greenhouse gas reporting (GHGRP) |
|
| Fuel burned (MMBtu), 2025 | 20,779 |
| Capacity factor, 2025 | 0.004 |
| Heat rate (Btu/kWh), 2025 | 11,105.8 |
| Net generation (MWh), 2025 | 1,871.0 |
| Balancing authority code | CISO |
Ownership
5 companies5| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| CalPeak Power, LLC | Operator | EIA-860M | ||
| TYR ENERGY | Owner | 20.0% | Dec 31, 2023 | EPA GHGRP |
| STARWOOD ENERGY GROUP | Owner | 14.2% | Dec 31, 2023 | EPA GHGRP |
| GSO Special Situations Fund LP | Owner | 65.8% | Dec 31, 2023 | EPA GHGRP |
| CalPeak Power - Panoche LLC | Owner | 100.0% | Dec 31, 2025 | EIA-860 |
Timeline
- In service · EIA-860M
Sources
6 sourcesSources EIA-860M · GEM · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT) · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules
Sources
- EIA-860M
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
- EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Iron BESS Under construction | Storage | 0.1 mi | 59.5 |
| Midway BESS Under construction | Storage | 0.1 mi | 124.6 |
| Little Bear Solar 2, LLC Contracted | Solar + storage | 10.4 mi | 20 |
| EDPR CA Solar Park VI LLC (CA) Hybrid Under construction | Solar + storage | 11.3 mi | 241 |
| EDPR Scarlet III Under construction | Storage | 13.1 mi | 70 |