Show on map
CalRenew-1 — Power plant · Solar · CalRenew-1 LLCLittle Bear Solar 2, LLC — Contracted · Solar + storage · CA · 20 MW · 3.8 mi awayEDPR CA Solar Park VI LLC (CA) Hybrid — Under construction · Solar + storage · CA · 241 MW · 9.2 mi awayEDPR Scarlet III — Under construction · Storage · CA · 70 MW · 10.3 mi awayIron BESS — Under construction · Storage · CA · 59.5 MW · 13.8 mi awayMidway BESS — Under construction · Storage · CA · 124.6 MW · 13.8 mi away
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Solar

Key facts

Power plant · Solarran 4% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2010
Net generation, 2025
1,870 MWh
Grid
70 kV to Pacific Gas & Electric Co (CISO)
Location
Fresno County, California
Operated by
CalRenew-1 LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2010 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
16 years since 2010
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000814920
Location id
L100000812308
Eia plant ids
56768
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
70
Transmission owner
Pacific Gas & Electric Co
Balancing authority code
CISO
Balancing authority name
California Independent System Operator
Fuel burned (MMBtu), 20256,380
Capacity factor, 20250.043
Net generation (MWh), 20251,870
Balancing authority codeCISO

Solar array

Array area (acres)
39.9
AC capacity (MW)
5
DC capacity (MW)
6.3
Mounting
Fixed tilt
Site type
Greenfield
Began operating
2010

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Little Bear Solar 2, LLC Contracted Solar + storage 3.8 mi 20
EDPR CA Solar Park VI LLC (CA) Hybrid Under construction Solar + storage 9.2 mi 241
EDPR Scarlet III Under construction Storage 10.3 mi 70
Iron BESS Under construction Storage 13.8 mi 59.5
Midway BESS Under construction Storage 13.8 mi 124.6

Sources CAISO · EIA-860M

Sources

  • CAISOOpen license, with credit · retrieved Nov 13, 2026Source: California ISO
  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution