Cambridge — Power plant · Oil · City of Cambridge - (NE)
  • Combustion
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Oil

Key facts

Power plant · Oilran 0% of 2025 Standby
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2005
Net generation, 2025
20 MWh
Grid
69 kV to Twin Valleys Public Power Dist (SWPP)
Location
Furnas County, Nebraska
Operated by
City of Cambridge - (NE)SourceEIA-860M Preliminary Monthly Electric Generator Inventory

Operations

Net generation, 2025
20MWh
Fuel burned, 2025
217MMBtu
Capacity factor, 2025
0.1%
Heat rate, 2025
10,850Btu/kWh
Capacity factor % of full output, by year
Heat rate Btu per kWh, by year
Net generation, fuel burned, capacity factor and heat rate by year, newest first, as EIA's bulk electricity file states them.
YearNet generation (MWh)Fuel burned (MMBtu)Capacity factorHeat rate (Btu/kWh)
2025202170.1%10,850
2024555460.2%9,927
2023122190.0%18,250
2022374180.1%11,297
20211008810.3%8,810
2020212110.1%10,048
20194580.0%14,500
20185580.0%11,600
2017384120.1%10,842
2016232430.1%10,565
2015373840.1%10,378
2014394070.1%10,436
2013566100.2%10,893
2012566090.2%10,875
2011273870.1%14,333
2010203100.1%15,500
200991220.0%13,556
2008566730.2%12,018
2007808950.2%11,187
2006585930.2%10,224
20045590.0%11,802
2003598020.2%13,593
2002516270.1%12,294
How these are worked out

Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.

Sources

2 sources

Sources EIA-860M · EIA

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)

Every source and license · Attribution

View at source